Number
091233
Version
SUBSTITUTE 1
Reference
041565
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $288,681 for a total estimated cost of $2,985,400.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $288,681. The total estimated cost of these projects is $2,985,400.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:
2nd Aldermanic District
W. Silver Spring Dr. - N. 68th St. to N. 90th St. (Including service drives (south side) N. 68th St. to N. 74th St. (ST20901300): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7.0-foot width of tree border area), and grading.
City Share Non-assessable Paving Fund--$222,281;
City Share Assessable Paving Fund --$ 6,000
These funds are to be transferred to the construction account (ST32010XXX)(2090-11-70)
Previously authorized for street construction: $0.00
Current estimated cost of the total project including this resolution: $2,925,000
Original estimated cost of the total project: $2,925,000
This project is anticipated to be completed during the 2010 construction season.
8th Aldermanic District
S. 28th St. - W. National Ave. to W. Pierce St. (ST211100149): Install traffic calming speed hump(s). (Assess...
Click here for full text