9/14/2022 | 0 |
CITY CLERK
| Sponsor removed
Minutes note: Moot due to multiple changes of plan, per Tim Askin - HPC | | |
Action details
|
Meeting details
|
Not available
|
3/4/2019 | 0 |
HISTORIC PRESERVATION COMMISSION
| HELD IN COMMITTEE
Minutes note: Mr. Tim Askin said this is to revise a previously approved addition and the Brewer's Hill guidelines do not encourage this work. The door is visible from the public right of way. The doors do not yet exist.
Tom van Heijningen - 135 E. National Ave. - he is the contractor who is proposing a fiberglass door that looks like wood and will be painted. The owner wants an 84" tall door and the cost difference is $2,000. This would be a high-end French door. This door will be on the second story.
The Commission already approved the French doors; just looking at the materials at this point.
Held to the call of the chair so a sample can be brought in. | Pass | 5:0 |
Action details
|
Meeting details
|
Video
|