File #: 201137    Version:
Type: Resolution Status: Passed
File created: 12/15/2020 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 1/19/2021
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $727,000 for a total estimated cost of $970,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. signed letter.pdf, 2. Official Notice Cycle 6.pdf, 3. Signed ad 6.pdf, 4. Proof of Publication
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
1/28/20211 MAYOR SIGNED   Action details Meeting details Not available
1/19/20211 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
1/6/20211 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 10th Aldermanic District N. 60th St. – W. McKinley to W. Vliet St. (Sponsored by the City of Wauwatosa) (ST211190106) Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Perez moved approval. (Prevailed 5-0) N. 60th St. – W. Wells St. to W. Valley Forge Dr. (Sponsored by the City of Wauwatosa) (ST211190101) Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Ald. Stamper moved approval. (Prevailed 5-0) 11th Aldermanic District S. 45th St., S. 47th St., W. Crawford Ave., W. Tripoli Ave. (Sponsored by the City of Greenfield) (ST211180279) Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (18’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
12/15/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
201137
Version
SUBSTITUTE 1
Reference
181587
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $727,000 for a total estimated cost of $970,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $727,000. The total estimated cost of these projects is $970,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

10th Aldermanic District

N. 60th St. - W. McKinley to W. Vliet St. (Sponsored by the City of Wauwatosa) (ST211190106) File Number 181587: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $21,500; Nonassessable Reconstruction Paving Fund -- $255,000). The total estimated cost of this project including the requested amount is $280,000. This project is anticipated to be completed during the 2021 construction season.

N. 60th St. - W. Wells St. to W. Valley Forge Dr. (Sponsored by the City of Wauwatosa) (ST211190101) File Number 171478: Asphalt pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. (Assessable Reconstruction Paving...