File #: 191972    Version:
Type: Resolution Status: Passed
File created: 4/14/2020 In control: COMMON COUNCIL
On agenda: Final action: 5/27/2020
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $978,500 for a total estimated cost of $1,075,000.
Sponsors: THE CHAIR
Indexes: ASSESSMENTS, PUBLIC IMPROVEMENTS
Attachments: 1. D12 email, 2. Letter signed.pdf, 3. Signed Box Ad 11.pdf, 4. Official Notice 11.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/10/20201 MAYOR SIGNED   Action details Meeting details Not available
5/27/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
5/13/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 6th Aldermanic District Alley between E. Concordia Ave., N. Palmer St., N. Richards St., N. Townsend St. (ST21200123) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Ald. Borkowski moved approval. (Prevailed 5-0) 9th Aldermanic District W. Good Hope Rd (south side). - N. 60th St. to N. 76th St. (ST210020103) Install new walk and replace driveway approaches as necessary, sodding and grading. Ald. Lewis stated she is in support. Dave Tomashek 6701 W Good Hope Rd stated he is in support. Ald. Stamper moved approval. (Prevailed 5-0) 12th Aldermanic District Alley between W. Historic Mitchell St., W. Lapham Blvd., S. 8th St., S. 9th St. (North-South Leg and Southerly East-West Leg) (ST212010135) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Cam Roberts 1635 S 8th St stated she doesn't understand why this alley is being done when 8th Street is a mess. Ald. Perez moved approval. (Prevailed 5-0) 13th Aldermanic District W. Van Beck Ave. - S. 20th Pl. to S. 24th St. (ST211150145) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9’-10’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) S. 20th Pl. - W. Van Beck Ave. to W. Howard Ave. (ST211150146) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9‘-10’ width of tree border area), and grading. Ald. Stamper moved approval. (Prevailed 5-0) S. 22nd St. - W. Van Beck Ave. to W. Howard Ave. (ST211150147) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding ( 9’-10’ width of tree border area), and grading. Ald. Stamper moved approval. (Prevailed 5-0) S. 24th St. - W. Van Beck Ave. to W. Howard Ave. (ST211150148) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9’-10’ width of tree border area), and grading. Ald. Zamarripa moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
4/14/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
191972
Version
SUBSTITUTE 1
Reference
050224
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $978,500 for a total estimated cost of $1,075,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $978.500. The total estimated cost of these projects is $1,075,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

6th Aldermanic District

Alley between E. Concordia Ave., N. Palmer St., N. Richards St., N.Townsend St. (ST21200123). File Number 050224: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. (Assessable Alley Paving Fund -- $35,000; Nonassessable Alley Paving Fund -- $80,000). The total estimated cost for this project including the requested amount is $120,000. This project is anticipated to be completed during the 2020 construction season

9th Aldermanic District

W. Good Hope Rd. (south-side) - N. 60th St. to N. 76th St. (ST210020103/ST211200122). Install new walk. File Number 020843: Install new walk and replace driveway approaches as necessary, sodding and grading. (Nonassessable Reconstruction Paving Fund -- $200,000; Nonassessable New Paving Fund -- $80,000; Assessable New Paving Fund -- $...

Click here for full text