powered help
header-left header-center header-right
File #: 980790    Version: 0
Type: Resolution Status: Passed
File created: 9/23/1998 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/9/1998
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Div.)
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, STREET IMPROVEMENTS
NUMB:
980790
VERS:
ORIGINAL
XXBY:
THE CHAIR
TITL:
Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Div.)
ANLS:
-Analysis-

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.
BODY:
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

3rd Aldermanic District

Alley between E. Auer Ave., N. Booth St., E. Concordia Ave., N. Pierce St. and Soo Line Railroad Right-of-Way (880-0819-8): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

4th Aldermanic District

Alley between N. Broadway, E. Clybourn St., E. Michigan St. and N. Water St. (880-0824-5): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

5th Aldermanic District

Alley between W. Auer Ave., W. Concordia Ave., N. 89th St. and N. 90th St. (880-0821-9): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

6th Aldermanic District

Alley between W. Auer Ave., W. Ring St., N. 2nd St. and N. 3rd St. (880-0822-4): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

Alley between ...

Click here for full text