powered help
header-left header-center header-right
File #: 110416    Version: 0
Type: Resolution Status: Passed
File created: 7/26/2011 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/11/2011
Effective date:    
Title: : Resolution regarding the Milwaukee Water Works tunnel between the Linnwood Water Treatment Plant and the Riverside Pumping Station.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, WATER WORKS
Attachments: 1. Hearing Notice List

Number:
110416
Version:
ORIGINAL


Reference:

Sponsor:
THE CHAIR


Title:
Resolution regarding the Milwaukee Water Works tunnel between the Linnwood Water Treatment Plant and the Riverside Pumping Station.


Analysis:
This resolution authorizes the issuance of a Request  for Proposals and execution of a contract for services to perform a physical inspection and any necessary repairs of the tunnel that delivers treated drinking water from the Linnwood Water Treatment Plant to the Riverside Pumping Station. 

 

Body:
Whereas, Milwaukee Water Works has a 7,200 foot tunnel that has been in service since the 1920’s which transports treated drinking water from the Linnwood Water Treatment Plant to the Riverside Pumping Station; and

 

Whereas, The tunnel was last inspected and repaired in 1986; and

 

Whereas, The prudent management of this critical infrastructure necessitates, and Wisconsin Department of Natural Resources recommends, that Milwaukee Water Works perform a physical inspection of the tunnel; and

 

Whereas, It is likely that certain areas needing repair will be identified during the inspection and these repairs should be made while the tunnel is out of service for the inspection; and

 

Whereas, It is impractical to develop precise bidding specification for these services, estimated to cost $1,200,000, which Milwaukee Water Works will fund through existing borrowing authority; now, therefore be it

 

Resolved, By the Common Council of the City of Milwaukee, that the Commissioner of Public Works is hereby authorized and directed to issue a Request for Proposals and execute a contract for services to perform a physical inspection and any necessary repairs of the tunnel between the Linnwood Water Treatment Plant and the Riverside Pumping Station.

 

Requestor:

Department of Public Works

Milwaukee Water Works

 

Drafter:

Administration

Carrie M. Lewis
7/14/2011