powered help
header-left header-center header-right
File #: 050224    Version:
Type: Resolution Status: Passed
File created: 6/14/2005 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/6/2005
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, STREET IMPROVEMENTS
Attachments: 1. Fiscal Note.pdf, 2. Infr. Serv. Div. Cover Letter.pdf, 3. Sub. 1 Fiscal note.pdf
Number
050224
Version
SUBSTITUTE 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

2nd Aldermanic District

N. 74th St. - W. Hampton Ave. to W. Medford Ave. (ST211070104): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $16,000)

2nd and 7th Aldermanic Districts

N. 51st Bl. - W. Keefe Ave. to W. Capitol Dr. (ST211070103): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $20,000)

5th Aldermanic District

W. Keefe Ave. - N. 76th St. to N. 80th St. (ST21100140): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $8,000)

N. 88th St. - W. Chambers St. to W. Burleigh St. (ST211070106): Paving the...