powered help
header-left header-center header-right
File #: 210434    Version: 0
Type: Resolution Status: Passed
File created: 7/7/2021 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/27/2021
Effective date:    
Title: Resolution setting up funding from the Milwaukee Metropolitan Sewerage District (MMSD) for design engineering costs at a total estimated cost of $2,139,000 and an estimated City of Milwaukee share of $694,500 and a grantor share of $1,444,500 for six City owned bridges as part of the MMSD Kinnickinnic River Flood Management Project S. 6th Street to S. 16th Street Reach.
Sponsors: THE CHAIR
Indexes: BRIDGES, FLOOD CONTROL, GRANTS, MILWAUKEE METROPOLITAN SEWERAGE DISTRICT
Attachments: 1. Cert.pdf, 2. 6th to 16th MMSD Bridge Resolution.pdf
Number
210434
Version
ORIGINAL
Reference

Sponsor
THE CHAIR
Title
Resolution setting up funding from the Milwaukee Metropolitan Sewerage District (MMSD) for design engineering costs at a total estimated cost of $2,139,000 and an estimated City of Milwaukee share of $694,500 and a grantor share of $1,444,500 for six City owned bridges as part of the MMSD Kinnickinnic River Flood Management Project S. 6th Street to S. 16th Street Reach.

Analysis
This resolution directs the City of Milwaukee Comptroller to transfer funds and establish project grant chartfield values for the preliminary engineering for these project. The MMSD Agreement approved in Common Council File 190537 sets forth that MMSD will provide a percentage of funding based on the remaining useful life of the structure. The agreement provides for an average of 67 percent MMSD funds and 33 percent local funds. Construction funding will be included in future resolutions.

Body
Whereas, MMSD is undertaking the Kinnickinnic River Flood Management Project to expand the River Channel and replace the existing concrete-lined channel to a more naturalized stream design; and

Whereas, the City desires to cooperate with MMSD, on the terms and conditions in the MMSD Agreement as indicated in Common Council File 190537.

Whereas, The agreement includes programming, design, and construction for the following bridge structures:

9th Place Bridge P-40-625
Over Kinnickinnic River

13th Street P-40-839
Over Kinnickinnic River

16th Street P-40-622
Over Kinnickinnic River

8th Street B-40-904
Over Kinnickinnic River

11th Street B-40-905
Over Kinnickinnic River

15th Street B-40-906
Over Kinnickinnic River

Whereas, the Department of Public Works shall notify the Common Council of the City of Milwaukee of project cost overruns and changes in scope approved by the Department of Public Works; and

Whereas, Construction of these projects is currently scheduled to start in 2023-2025, now therefore, be it

Res...

Click here for full text