11/4/2024 | 0 |
HISTORIC PRESERVATION COMMISSION
| ADOPTED
Minutes note: Mr. Andrew Stern said the applicants are doing kitchen work which would affect the rear facade (removal of three French doors, which would be replaced by windows and a Pella door). The area below the windows will be clad with cedar shingles to match the house and the other two sets of French doors will also be replaced with windows. The pergola will be removed, as well as the decking material. The structural elements of the deck will remain as long as they are structurally sound, otherwise they will be replaced in-kind and the deck will expand out three feet (stairs will remain in the same place). The roof will be expanded. Staff recommends approval with conditions detailed in the report (standard wood conditions and spindle spacing). | Pass | 7:0 |