powered help
header-left header-center header-right
File #: 021411    Version:
Type: Resolution Status: Passed
File created: 1/22/2003 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/11/2003
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS, STREET IMPROVEMENTS
Attachments: 1. Infr. Serv. Div. cover letter.pdf, 2. FISCAL NOTE.pdf

Number
021411
Version
SUBSTITUTE 1
Reference
991203
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

N. Green Bay Ave. (Including Structure) – W. Villard Ave. to City Limits North (A point north of W. Silver Spring Dr.) (Including W. Silver Spring Dr. Interchange Ramps) (ST32092601) (2565-00-72/2565-03-71) File Numbers 991203/891473: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary. (Assessable State Aid Fund -- $15,800; Nonassessable State Aid Fund -- $86,000; State or Federal Funds -- $803,500; State/Federal Grantor Paving Fund -- $122,000; State or Federal Structure Funds -- $505,500; State/Federal Grantor Structure Fund -- $76,000) These funds are to be transferred to the construction account ST32092610.

4th Aldermanic District

Alley between W. Cherry St., W. Vliet St., N. 30th St., and N. 31st St. (ST212030128) File Number 020020: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $35,200; Nonassessable Alley Paving Fund -- $21,100)

8th Aldermanic District

Alley between W. Evergreen Ln., S. Layton Bl., W. Pierce St., and S. 28th ...

Click here for full text