File #: 220757    Version:
Type: Resolution Status: Passed
File created: 9/20/2022 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/11/2022
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $2,961,423.11 for a total estimated cost of $17,308,793.11.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Signed AFR Letter.pdf, 2. Signed AD.pdf, 3. 2674-02-70 Comptrollers Cert.pdf, 4. 2984-00-74 Comptrollers Cert.pdf, 5. AD 2.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
10/28/20221 CITY CLERK PUBLISHED   Action details Meeting details Not available
10/19/20221 MAYOR SIGNED   Action details Meeting details Not available
10/11/20221 COMMON COUNCIL ADOPTEDPass10:0 Action details Meeting details Not available
9/28/20221 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Holly Ruttenbeck - DPW - said that no survey is conducted for this type of assessments. David Tapia said that there were 2 informational meetings (one virtual and one in person) and that in general, they were well attended and that the majority seemed satisfied with the projects. 4th and 15th Aldermanic Districts W. Vliet St. - N. 12th St. to N. 27th St. (ST3202208XX) Concrete pavement reconstruction, replace curb and gutter, sidewalk and driveway approaches as necessary, signals, street lighting, storm sewer and grading. Ms. Ruttenbeck said that this project if for driveways approaches and sidewalks of 95 properties. Ald. Stamper moved approval. There were no objections. (Prevailed 4-0) 15th Aldermanic District W. Walnut St. - N. 12th St. to N. 20th St. (ST3201903XX) Concrete pavement reconstruction, replace curb and gutter, sidewalk and driveway approaches as necessary, sodding (9.5' width of tree border area), grading, separated bike lanes, signals, street lighting, and storm sewer. Ms. Ruttenbeck said that this project is for driveways approaches and sidewalks of 35 properties. Ald. Stamper moved approval. There were no objections. (Prevailed 4-0)
Pass4:0 Roll call Meeting details Video Video
9/26/20220 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
9/20/20220 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
220757
Version
SUBSTITUTE 1
Reference
220615
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $2,961,423.11 for a total estimated cost of $17,308,793.11.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $2,961,423.11. The total estimated cost of these projects is $17,308,793.11.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

4th and 15th Aldermanic Districts

W. Vliet St. - N. 12th St. to N. 27th St. (ST3202208XX) (2984-00-74) File Number 220615: Concrete pavement reconstruction, replace curb and gutter, sidewalk and driveway approaches as necessary, signals, street lighting, storm sewer, and grading. This project is anticipated to be completed during the 2023 construction season.

Grantor Non-Reimbursable Paving Fund - ($797,973.91)
Grantor Reimbursable Paving Fund -- $840,303.91
City Share Assessable Paving Fund -- $32,000.00
City Share Non-Assessable Paving Fund - $99,131

These funds are to be transferred to the construction account (ST3202208xx) (2984-00-74)

Previously authorized for project construction: $0.00
Current estimated cost of total project including this resolution: $10,178,461
Original estimated cost of the project: (File Number 212037): $10,000,000