File #: 180028    Version:
Type: Resolution Status: Passed
File created: 4/17/2018 In control: COMMON COUNCIL
On agenda: Final action: 5/8/2018
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $2,701,100 for a total estimated cost of $2,921,500.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AFR-LTR11 signed.pdf, 2. Official Notice, 3. Notice Published on 05-24-18
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/24/20181 CITY CLERK PUBLISHED   Action details Meeting details Not available
5/17/20181 MAYOR SIGNED   Action details Meeting details Not available
5/8/20181 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
4/25/20180 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District N. 49th St. - W. Villard Ave. to W. Custer Ave. (ST211180105) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 2nd Aldermanic District W. Carmen Ave. - N. 68th St. to N. 76th St. (ST211140127) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (15’ width of tree border area), and grading. Michael Gradus Legislative Assistant stated Ald. Johnson is in support. Ald. Borkowski moved approval. (Prevailed 5-0) N. 87th St. - W. Silver Spring Dr. to W. Fond du lac Ave. (ST211150112) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7’width of tree border area), and grading. Michael Gradus Legislative Assistant stated Ald. Johnson is in support. Ald. Donovan moved approval. (Prevailed 5-0) 3rd Aldermanic District N. Summit Ave. - E. Locust St. to E. Kenwood Blvd. (ST211180113) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’width of tree border area), and grading. Ald. Kovac moved approval. (Prevailed 5-0) 4th Aldermanic District W. Clybourn St. - N. 29th St. to N. 35th St. (ST211180180) Install traffic calming speed hump(s). Mike Brower St. Rose Catholic School 540 N 31st St stated he is in support. Darryl Collins St. Rose Catholic School 540 N 31st St stated he is in support. Sherrie Tussler 3402 W St Paul Ave stated she is in support. Pat Curl 3208 W Clybourn Ave stated he is in support. Ald. Murphy moved approval. (Prevailed 5-0) 7th Aldermanic District N. 39th St. -- W. Ruby Ave. to W. Courtland Ave. (ST211050111) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Terry Clayton 4654 N 39th St stated he is opposed because he already pays taxes and would like speed humps. Shirley Keen 4578 N 39th St stated she cannot afford the payment. Juan Contreras 4046 N 39th St stated he wants speed humps. Sherman Morton Legislative Assistant stated Ald. Rainey is in support of the project. Ald. Kovac moved to hold to the call of the chair to add speed humps. (Prevailed 5-0) N. 44th St. - W. Townsend St. to W. Keefe Ave. (ST211180185) Install traffic calming speed hump(s). Sherman Morton Legislative Assistant stated Ald. Rainey is in support of the project. Ald. Borkowski moved approval. (Prevailed 5-0) N. 49th St. - W. Locust St. to W. Chambers St. (ST211180186) Install traffic calming speed hump(s). Sherman Morton Legislative Assistant stated Ald. Rainey is in support of the project. Ald. Kovac moved approval. (Prevailed 5-0) N. 53rd St. - W. Keefe Ave. to W. Nash St. (ST211180187) Install traffic calming speed hump(s). Sherman Morton Legislative Assistant stated Ald. Rainey is in support of the project. Ald. Borkowski moved approval. (Prevailed 5-0) 8th Aldermanic District S. 28th St. - W. National Ave. to W. Pierce St. (ST211180115) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. Ald. Donovan moved approval. (Prevailed 5-0) S. 30th St. - W. Greenfield Ave. to W. Scott St. (ST211180144) Install traffic calming speed hump(s). Javier Corubias 1254 S 30th St stated people drive like crazy and is opposed to the speed humps. Ald. Donovan moved approval. (Prevailed 5-0) 10th Aldermanic District S. 91st St. – A point 300’ south of W. Adler St. to W. Adler St. (ST211070132) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5’ width of tree border area), and grading. Ald. Murphy moved approval. (Prevailed 5-0) 11th Aldermanic District W. Verona Ct. - S. 77th St. to S. 79th St. (ST211180114) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) S. 54th St. – W. Midland Dr. to W. Forest Home Ave. (ST211180106) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) 12th Aldermanic District S. 3rd St. - W. Maple St. to W. Lapham Blvd. (ST21100102) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 4-0) S. 19th St. - W. Lincoln Ave. to W. Grant St. (ST211170135) Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 4-0) 13th Aldermanic District S. 16th St. - W. Edgerton Ave. to 300 feet north of W. Vogel Ave. (ST211150107) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. Ald. Witkowski stated he had 1 objector. Ald. Murphy moved approval. (Prevailed 4-0) 15th Aldermanic District W. Clarke St. - N. 23rd St. to N. 24th St. (ST211180188) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0) N. 24th Pl. - W. Clarke St. to W. Center St. (ST211180184) Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 4-0) N. 24th St. - W. Clarke St. to W. Center St. (ST211180183) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0) N. 41st St. - W. Meinecke Ave. to W. Wright St. (ST211180104) Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (4’ width of tree border area), and grading. Linda Martin 2462 N 41st St stated she wants speed humps. Ald. Kovac moved approval. (Prevailed 4-0) Ald. Borkowski moved approval as amended. (Prevailed 5-0)
Pass4:0 Action details Meeting details Video Video
4/17/20180 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
180028
Version
Original
Reference
160587
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $2,701,100 for a total estimated cost of $2,921,500.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $2,701,100. The total estimated cost of these projects is $2,921,500.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

N. 49th St. -- W. Villard Ave. to W. Custer Ave. (ST211180105) File Number 160587:
Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $11,600; Nonassessable Reconstruction Paving Fund -- $185,000). The total estimated cost for this project including the requested amount is $215,000. This project is anticipated to be completed during the 2018 construction season.

2nd Aldermanic District

W. Carmen Ave. -- N. 68th St. to N. 76th St. (ST211140127) File Number 120251:
Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (15’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $12,100; Nonassessable Reconstruction Paving Fund -- $450,0...