File #: 230866    Version:
Type: Resolution Status: Passed
File created: 10/10/2023 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/31/2023
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $666,330 for a total estimated cost of $1,305,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Published AD.pdf, 2. Signed AD.pdf, 3. Signed LTR-AFR.pdf, 4. Notice published 11/17/2023
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
11/17/20231 CITY CLERK PUBLISHED   Action details Meeting details Not available
11/9/20231 MAYOR SIGNED   Action details Meeting details Not available
10/31/20231 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
10/18/20231 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Holly Rutenbeck - DPW 7th Aldermanic District Alley betw. W. Capitol Dr., W. Melvina st., N. 52nd st., N. 53rd St. (ST212230101) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Individuals also present: Ald. Rainey said that according to survey, 2 owners are against of the project and 2 in favor and that it depends on how many neighbors are present to testify. There were no neighbors present. Ald. Stamper moved approval. There were no objections. 8th Aldermanic District Alley betw. W. Burnnam st., W. Rogers st., S. 19th St. S. 20th St. (s 1212220111) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Ms. Rutenbeck said that Ald. Zamarripa is in support. Ald. Westmoreland moved approval. There were no objections. 9th Aldermanic District N. Hastings St. — W. Acacia St. to W. Denver Av. (ST211210225) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8' width of tree border area), and grading. Ms. Rutenbeck said that the survey was favorable but that Ald. Taylor does not support the project. Ald. Westmoreland moved withdrawal. There were no objections. 10th Aldermanic District Alley betw. W. Galena st., W. Vliet st., N. 51st st., N. 52nd St. (ST212220117) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Ms. Rutenbeck said that the survey was favorable and that Ald. Murphy supports the project. Ald. Westomoreland moved approval. There were no objections. 14th Aldermanic District Alley betw. S. Graham St., E. Homer St., S. Kinnickinnic Ave., E. Otjen St. (ST212180105) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. Neighbors in support: Adam Molitor - 522 E Otjen St. - said that it is needed but that he wishes that those who requested or filed permits for mayor capital improvements pay for it. Ellen and Tim Quale - 600 E Otjen St. Gene Seidler - 606 E Otjen St. Individuals also present: Ms. Rutenbeck said that 32 properties were surveyed: 5 in favor and 2 in opposition. Ald. Westmoreland move approval. There were no objections.
Pass3:0 Roll call Meeting details Video Video
10/10/20230 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
230866

Version
SUBSTITUTE 1

Reference
221940

Sponsor
THE CHAIR

Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $666,330 for a total estimated cost of $1,305,000.

Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $666,330. The total estimated cost of these projects is $1,305,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

7th Aldermanic District

Alley betw. W. Capitol Dr., W. Melvina St., N. 52nd St., N. 53rd St. (ST212230101) File Number 221940: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. (Assessable Alley Paving Fund - $63,440; Nonassessable Alley Paving Fund -- $127,000). The total estimated cost for this project including the requested amount is $375,000. This project is anticipated to be completed during the 2024 construction season.

8th Aldermanic District

Alley betw. W. Burnham St., W. Rogers St., S. 19th St. S. 20th St. (ST212220111) File Number 220617: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. (Assessable Alley Paving Fund - $44,500; Nonassessable Alley Paving Fu...