powered help
header-left header-center header-right
File #: 210057    Version:
Type: Resolution Status: Passed
File created: 5/4/2021 In control: COMMON COUNCIL
On agenda: Final action: 5/25/2021
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $839,300 for a total estimated cost of $873,400.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. signed Ad by City Clerk.pdf, 2. signed CE letter for afr.pdf, 3. Notice published on 6-11-2021
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/11/20211 CITY CLERK PUBLISHED   Action details Meeting details Not available
6/2/20211 MAYOR SIGNED   Action details Meeting details Not available
5/25/20211 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
5/12/20211 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 2nd Aldermanic District N. 62nd St. – W. Stark St. to W. Fairmount Ave. (ST211210147) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 5-0) 6th Aldermanic District N. Richards St. – E. Burleigh St. to E. Auer Ave. (ST211210124) Install traffic calming speed humps). Ald. Zamarripa moved approval. (Prevailed 5-0) 7th Aldermanic District Alley between W. Keefe Ave., W. Townsend St., N. 45th St., N. 46th St. (ST212180120) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Bernadette Karanja 3452 N 46th St stated she is in support. Ald. Perez moved approval. (Prevailed 5-0) N. 26th St. – W. Nash St. to W. Vienna Ave. (ST211210140) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 5-0) N. 41st St. -- W. Capitol Dr. to W. Fiebrantz Ave. (ST211210143) Install traffic calming speed hump(s). Ald. Perez moved approval. (Prevailed 5-0) N. 41st St. – W. Ruby Ave. to W. Glendale Ave. (ST211210141) Install traffic calming speed hump(s). Ald. Stamper moved approval. (Prevailed 5-0) N. 42nd St. – W. Glendale Ave. to W. Courtland Ave. (ST211210144) Install traffic calming speed hump(s). Ald. Perez moved approval. (Prevailed 5-0) N. 47th St. – W. Hadley St. to W. Locust St. (ST211210145) Install traffic calming speed hump(s). Ald. Zamarripa moved approval. (Prevailed 5-0) N. 52nd St. - W. Auer Ave. to W. Concordia Ave. (ST211210142) Install traffic calming speed hump(s). Ald. Perez moved approval. (Prevailed 5-0) 9th Aldermanic District W. River Ridge Dr. – A point 170’ +/- east of N. 103rd St. to a point 70’ +/- east of N. 103rd St. (SW495200015) Install sanitary sewer. Ald. Borkowski moved approval. (Prevailed 5-0) 13th Aldermanic District S. 5th Pl. – W. Howard Ave. to point north of W. Warnimont Ave. (W. Morgan Pl.) (ST211190141) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6-7’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 5-0) S. 7th St. – W. Mallory Ave. to W. Abbott Ave. (ST211200114) Asphalt surface overlay (15’ width of tree border area) Ald. Zamarripa moved approval. (Prevailed 5-0) 15th Aldermanic District Alley between W. Center St., N. Grant Blvd., W. Hadley St., N. 41st St. (ST212170101) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where necessary. Zach Patrini 2774 N Grant Blvd stated he has seen cars crash into his yard and his neighbors yard. He added that he is not in support. Ald. Stamper moved to hold to the call of the chair. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
4/28/20210 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
210057
Version
SUBSTITUTE 1
Reference
200595
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $839,300 for a total estimated cost of $873,400.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $839,3000. The total estimated cost of these projects is $873,400.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

2nd Aldermanic District

N. 62nd St. - W. Stark St. to W. Fairmount Ave. (ST211210147) Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $11,300; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost of this project including the requested amount is $13,300. This project is anticipated to be completed during the 2021 construction season.

6th Aldermanic District

N. Richards St. - E. Burleigh St. to E. Auer Ave. (ST211210124) Install traffic calming speed humps).(Assessable Reconstruction Paving Fund -- $7,000; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost of this project including the requested amount is $9,000. This project is anticipated to be completed during the 2021 construction season.


7th Aldermanic District

Alley between W. Keefe Ave., W. Townsend St., N. 45th St., N. 46th St. (ST212180120) File Nu...

Click here for full text