Substitute resolution authorizing area-wide and scattered sites sidewalk replacement at various areas and appropriating funds for these purposes with the city construction cost estimated to be $1,790,000 for a total estimated cost of these projects being $1,990,000.
Analysis
To provide the necessary authority for sidewalk repairs at various areas. The City cost of these projects approved by this resolution is estimated to be $1,805,000. The total estimated cost of these projects is $2,005,000.
Whereas, It is necessary and in the public interest to replace those sidewalk stones which are cracked, broken, out of grade or otherwise a hazard to pedestrians; and
Whereas, It is proposed that sidewalk replacement work be done in the following locations at the indicated cost:
3rd, 10th and 12th Aldermanic Districts
Area bounded by - E. North Av., N. Oakland Av., E. Irving Pl., E. Boylston St. and the Milwaukee River; and Area Bounded by W. Vine St., N. 47th St., W. Lloyd St., and N. Hi Mount Blvd. (ST230230101) File Number 221268: Laying concrete walk. Doing all necessary grading pertaining to said work. (Assessable Sidewalk Reconstruction Paving Fund -- $200,000; Nonassessable Sidewalk Reconstruction Paving Fund -- $625,000). The total estimated cost for this project including the requested amount is $925,000. This project is anticipated to be completed during the 2023 construction season.
ADA ramps for 2023 Area wide sidewalk repair areas (ST216230105): Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund -- $150,000). The total estimated cost of this project including the requested amount is $150,000. This project is anticipated to be completed during the 2023 construction season.
City Wide
2023 Scattered Sites (ST230230102) File Number 221268: Laying concrete walk. Doing all necessary grading pertaining to said work. (Ass...
Click here for full text