powered help
header-left header-center header-right
File #: 021620    Version:
Type: Resolution Status: Passed
File created: 3/4/2003 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 3/25/2003
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS
Attachments: 1. Fiscal Note.pdf, 2. Infr. Serv. Div. cover letter.pdf, 3. SUB 1 FISCAL NOTE.pdf

Number
021620
Version
SUBSTITUTE 1
Reference
020020
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

Alley between W. Hope Ave., W. Marion St., W. Sercombe Rd., N. 36th St., and N. 39th St. (Except North-South Leg) (ST212030112) File Number 020020: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, and storm drainage facilities where needed. (Assessable Alley Paving Fund -- $28,700; Nonassessable Alley Paving Fund -- $33,700)

2nd and 9th Aldermanic Districts

N. 64th St. – W. Villard Ave. to W. Silver Spring Dr. (ST211030104) File Number 020390: Asphalt pavement resurfacing, sidewalk and driveway approaches where needed, sodding and grading. (Assessable Reconstruction Paving Fund -- $133,200; Nonassessable Reconstruction Paving Fund -- $107,900)

N. 64th St. – W. Silver Spring Dr. to W. Kaul Ave. (ST211020116) File Number 020390: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, grading, and tree removal where necessary. (Assessable Reconstruction Paving Fund -- $265,800; Nonassessable Reconstruction Paving Fund -- $167,700)

3rd Aldermanic District

E. Keefe Ave. – N. Bremen St. to a point 125 feet m/l east of N. Weil St. (ST211030132) File Number 0211...

Click here for full text