File #: 170991    Version:
Type: Resolution Status: Passed
File created: 10/17/2017 In control: COMMON COUNCIL
On agenda: Final action: 11/7/2017
Effective date:    
Title: Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $30,000 for a total estimated cost of these projects being $125,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
11/21/20171 MAYOR SIGNED   Action details Meeting details Not available
11/7/20171 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
10/25/20170 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A
Pass5:0 Action details Meeting details Video Video
10/25/20170 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW
Pass5:0 Action details Meeting details Not available
10/17/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
170991
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $30,000 for a total estimated cost of these projects being $125,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $30,000 with the total cost estimated to be $125,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

8th Aldermanic District

W. Lincoln Ave.(S/S) at S. 37th St. (WT410170696): Replacing water valve and abandoning water main. (Nonassessable Water Fund Budget Line 5010 -- $2,000; Nonassessable Water Fund Budget Line 6410 -- $13,000). The total estimated cost for this project including the requested amount is $50,000. This project is anticipated to be completed during the 2018 construction season

11th Aldermanic District

W. Oklahoma Ave. - S. 49th St. to S. 60th St. (WT410170015): Hydrant alteration. (Nonassessable Water Fund Budget Line 5010 -- $3,000; Nonassessable Water Fund Budget Line 6410 -- $12,000). The total estimated cost for this project including the requested amount is $75,000. This project is anticipated to be completed during the 2018 construction season

;and, be it

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description o...

Click here for full text