File #: 090910    Version:
Type: Resolution Status: Passed
File created: 11/3/2009 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 12/1/2009
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $2,241,500 for a total estimated cost of these projects being $23,618,616.31.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Fiscal note, 3. Comptroller's Certification, 4. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
12/9/20091 MAYOR SIGNED   Action details Meeting details Not available
12/1/20091 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
11/18/20091 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Individual present: Clark Wantoch, Dept. of Public Works, Infrastructure Services
Pass5:0 Action details Meeting details Not available
11/10/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
11/3/20090 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
090910
Version
Substittute 1
Reference
090538
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $2,241,500 for a total estimated cost of these projects being $23,618,616.31.
Analysis
This resolution directs the installation and construction of certain public improvements, including several ARRA projects, which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $2,241,500. The total estimated cost of these projects is $23,618,616.31.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

1st Aldermanic District

N. Sherman Blvd. - W. Silver Spring Dr. to W. Florist Ave (ST520091210) (2155-02-72) File Number 090538: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding, and grading. (City Share Non-assessable Paving Fund -- $20,000). The total estimated cost for this project including the requested amount is $620,000. This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.

N. Sherman Blvd. Bridge - Over W. Silver Spring Dr. (BR100070103) (2155-00-01) File Number 061498: Rehabilitate bridge (City Share Non-assessable Structure Fund -- $20,000). The total estimated cost for this project including the requested amount is $742,500. This project is anticipated to be completed during the 2010 construction season with ARRA construction funds.


N. Teutonia Ave. - W. Mill Rd. to W. Good Hope Rd. (ST520090310) (2984-03-70) File Numb...