File #: 061097    Version:
Type: Resolution Status: Passed
File created: 12/12/2006 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 1/17/2007
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $410,000 for a total estimated cost of these projects being $9,910,200.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter.pdf, 2. E-mail from constituent to Ald. Bohl re: 121st Bobolink Project, 3. Letter to ALd. Bohl & Email submitted at mtg 1-3-07, 4. Sub 1 Fiscal Note, 5. Sub 2 Fiscal Note
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
1/23/20072 MAYOR SIGNED   Action details Meeting details Not available
1/17/20072 COMMON COUNCIL ADOPTEDPass13:0 Action details Meeting details Not available
1/3/20071 PUBLIC WORKS COMMITTEE AMENDED

Minutes note: Appearances by: Ald. Bohl, 5th Aldermanic District Clark Wantoch, Adiminstration & Transportation Design Manager, Dept. of Public Works Paula Black - Cadwell Banker Realty for the sale of property in the area of 121st & Bobolink Ave. Fredrick Anderson, Property owner of several lots in the area of 121st & Bobolink Ave. Oscar A. Froeblich, Jr., 12131 W. Bobolink Ave. Tim Erkander, 12031 W. Bobolink Ave. Linda Burke, Deputy City Attorney Anthony Robertson, 11941 W. Bobolink Ave. Ald. Puente moved to make letter and e-mail submitted by Ald. Bohl a part of the record. Ald. Witkowski moved to amend by holding the following items in the 5th Aldermanic District: W. Flagg St. (Extended) - 130 feet m/l west of N. 119th St. to N. 121st St. (SW170060109): Installing new sanitary and storm sewers. (Nonassessable Expansion of Capacity Sewer Fund -- $5,000). The total estimated cost for this project including the requested amount is $160,000. This project is anticipated to be completed during the 2007 construction season. N. 121st St. - A point 450 feet m/l south of W. Bobolink Ave. to W. Bobolink Ave. (ST210060101): Construct asphalt pavement, construct curb and gutter. Doing all the necessary grading pertaining to said work. (Nonassessable New Paving Fund -- $15,000). The total construction cost for this project including the requested amount is $110,000. This project is anticipated to be completed during the 2007 construction season. N. 121st St. - A point 450 feet m/l south of W. Bobolink Ave. to W. Bobolink Ave. (SW170060110): Installing new sanitary and storm sewers. (Nonassessable Expansion of Capacity Sewer Fund -- $5,000). The total estimated cost for this project including the requested amount is $157,000. This project is anticipated to be completed during the 2007 construction season.
Pass5:0 Action details Meeting details Not available
1/3/20072 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass5:0 Action details Meeting details Not available
12/21/20060 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
12/21/20061 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
12/14/20060 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
12/12/20060 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
061097
Version
SUBSTITUTE 2
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $410,000 for a total estimated cost of these projects being $9,910,200.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $410,000 with the total cost estimated to be $9,910,200.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

1st Aldermanic District

Alley between W. Hope Ave., W. Roosevelt Dr., N. 29th St., and N. 30th St. (ST21210122): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (Nonassessable Alley Paving Fund -- $10,000, additional funds). File Number 060138 authorized $4,600. The total estimated engineering cost including this request is $14,600. The total estimated cost for this project including the requested amount is $119,000. This project is anticipated to be completed during the 2008 construction season.

2nd Aldermanic District

W. Florist Ave. - N. 68th St. to N. 76th St. (ST211070124): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying...