File #: 241189    Version:
Type: Resolution Status: Passed
File created: 11/26/2024 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 12/17/2024
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $22,574,794.66 for a total estimated cost of $35,424,812.66.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Signed LTR.pdf, 2. Signed AD.pdf, 3. AD 5.pdf, 4. Comptroller's Certification 2590-04-71.pdf
Number
241189
Version
SUBSTITUTE 1
Reference
200576
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $22,574,794.66 for a total estimated cost of $35,424,812.66.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $22,574,794.66. The total estimated cost of these projects is $35,424,812.66.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

5th and 10th Aldermanic District

W. Lisbon Ave. - W. Burleigh St. to N. 100th St. (ST3202009XX) (2590-04-71) File Number 200576: Concrete pavement reconstruction, narrowing roadway, replace all curb and gutter, driveway approaches, and sidewalk, storm sewer, traffic signals, street lighting, raised separated asphalt bike lane in select locations, green infrastructure, traffic calming, sodding (variable width of tree border area), tree removal where necessary, and grading. This project is anticipated to be completed during the 2025-2026 construction season.

Grantor Non-Reimbursable Paving Fund -- $9,000,015.66
Grantor Reimbursable Paving Fund -- $1,350,002.34
City Share Assessable Paving Fund -- $156,500.00
City Share Non-Assessable Paving Fund -- $11,821,182.66

These funds are to be transferred to the construction accounts (ST3202009XX) (2590-04-71)

Green Infrastructure (SM4...