Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,348,600 for a total estimated cost of $1,567,000.
Sponsors: THE CHAIR
Indexes: ASSESSMENTS, PUBLIC IMPROVEMENTS
Attachments: 1. Cover Letter, 2. Official Notice, 3. Notice Published on 5-25-17
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
5/19/20171 MAYOR SIGNED   Action details Meeting details Not available
5/9/20171 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Not available
4/26/20171 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 1st Aldermanic District N. 42nd St. – W. Thurston Ave. to W. Florist Ave. (ST211170115): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) 2nd Aldermanic District W. Carmen Ave. – N. 72nd St. to N. 73rd St. (ST211170130): Install traffic calming speed hump(s). Ald. Bauman moved approval. (Prevailed 5-0) N. 75th St. – W. Beckett Ave. to W. Marion St. (ST211170184): Install traffic calming speed hump(s). Todd Miller, 2nd District Legislative Assistant, stated Ald. Johnson is in support. Robert Husar 4272 N 75th St. stated he is in support of the speed hump. Ald. Bohl moved approval. (Prevailed 5-0) 3rd Aldermanic District N. Maryland Ave. – N. Prospect Ave. to E. Newberry Blvd. (ST211160108): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (11-foot width of tree border area), and grading. Ald. Kovac stated there were 14 in favor and 9 opposed. Ron Steiner 2724 N Maryland Ave. stated he has concerns about the bill. Carmela Avery 2712 N Maryland Ave. stated she has concerns about the bill. Ald. Kovac moved approval. (Prevailed 5-0) 5th Aldermanic District Alley between W. Auer Ave., W. Concordia Ave., N. 87th St., and N. 88th St. (ST212010143): Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement where necessary. Ald. Bohl stated 25 property owners in favor and 5 opposed. Ald. Bohl moved approval. (Prevailed 5-0) Alley between W. Chambers St., W. Locust St., N. 76th St., and N. 77th St. (ST212060105): Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement where necessary. Ald. Bohl stated 15 residents in favor and 8 opposed. Ald. Bohl moved approval. (Prevailed 5-0) 6th Aldermanic District N. 6th St. – W. Fiebrantz Ave. to a point north of W. Fiebrantz Ave. (ST211120101): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7-foot width of tree border area), and grading. Mary Dziewiontkoski - DPW stated Ald. Coggs in support. Ald. Donovan moved approval. (Prevailed 5-0) 8th Aldermanic District S. 30th St. – W. Lapham Blvd. to W. Orchard St. (ST211170189): Install traffic calming speed hump(s). Ald. Donovan moved approval. (Prevailed 5-0) S. 31st St. – W. Grant St. to W. Becher St. (ST211170188): Install traffic calming speed hump(s). James Gack 2113 S 31st St. stated he is in support of speed bump. Ald. Donovan moved approval. (Prevailed 4-0) 9th Aldermanic District W. Woolworth Ave. – 400 feet m/l west of N. 51st St. to 200 feet m/l west of N. 56th St. (ST211150104): Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (5-foot width of tree border area), and grading. Dan Fraison 5320 W Woolworth Ave., 5135 W Mill Rd., 5202 W Woolworth Ave. stated he is in support of road but not sidewalk on the north side of the street. David Rackum 5307 W Mill Rd. stated he is in support of road but not sidewalk on the north side of the street. Ted Mcnamara 5519 W Woolworth Ave. stated he is in support of project and agrees that the sidewalk is not needed on the north side. Mary Dziewiontkoski - DPW stated Ald. Lewis is in support of not installing sidewalk on the north side of the street and installing on the south side as necessary. Ald. Bauman moved approval as amended. (Prevailed 5-0) N. 84th St. – W. Brentwood Ave. to W. Green Tree Rd. (ST211170183): Install traffic calming speed table(s). Dave Ackenbach 6738 N 84th St. stated he dispute that his property will benefit from this project. Joseph Blakeman - DPW stated Ald. Lewis is in support. Ald. Bauman moved approval. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
4/18/20170 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
170018
Version
SUBSTITUTE 1
Reference
150115
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,348,600 for a total estimated cost of $1,567,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,348,600. The total estimated cost of these projects is $1,567,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

N. 42nd St. - W. Thurston Ave. to W. Florist Ave. (ST211170115): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $18,000; Nonassessable Reconstruction Paving Fund -- $2,000). The total estimated cost for this project including the requested amount is $20,000. This project is anticipated to be completed during the 2017 construction season.

2nd Aldermanic District

W. Carmen Ave. - N. 72nd St. to N. 73rd St. (ST211170130): Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $3,400; Nonassessable Reconstruction Paving Fund -- $3,600). The total estimated cost for this project including the requested amount is $7,000. This project is anticipated to be completed during the 2017 construction season.

N. 75th St. - W. Beckett Ave. to W. Marion St. (ST211170184): Install traffic calming speed hump(s). (Asse...