powered help
header-left header-center header-right
File #: 231138    Version:
Type: Resolution Status: Passed
File created: 11/21/2023 In control: COMMON COUNCIL
On agenda: Final action: 12/12/2023
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $4,009,816.59 for a total estimated construction cost of $6,445,578.33.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Report 5.pdf, 2. AD 5.pdf, 3. Signed LTR-AFR.pdf, 4. Signed Ad.pdf, 5. Resolution Certification Comptroller's, 6. Notice published 1/3/24
Number
231138
Version
SUBSTITUTE 1
Reference
200576
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $4,009,816.59 for a total estimated construction cost of $6,445,578.33.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $4,009,816.59. The total estimated cost of these construction projects is $6,445,578.33.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

6th Aldermanic District

E./W. Locust St. - N. Holton St to N. 7th St. (ST3202008XX) (2455-07-70) File Number 200576: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (6‘ width of tree border area), street lighting, traffic signals, ADA curb ramps, traffic calming and grading. This project is anticipated to be completed during the 2024 construction season.

Grantor Non-Reimbursable Paving Fund -- $2,435,761.74
Grantor Reimbursable Paving Fund -- $365,364.26
City Share Assessable Paving Fund -- $8,000
City Share Non-Assessable Paving Fund -- $2,678,652.33

These funds are to be transferred to the construction accounts (ST3202008XX) (2455-07-70)

Street Lighting Funded in ST240240401--$416,100
CUC Funded in ST280240401-- $541,700

Previously authorized for project construction: $0.00
Current esti...