Title: Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $530,000 for a total estimated cost of these projects being $2,285,000.
Sponsors: THE CHAIR
Number
260864
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $530,000 for a total estimated cost of these projects being $2,285,000.
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction. The City cost for engineering these projects is estimated to be $530,000 with the total cost estimated to be $2,285,000.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.0703 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

3rd and 6th Aldermanic Districts
E. Burleigh St. - N. Humboldt Blvd. to N. Holton St. (ST211260142) Install traffic calming raised crosswalks(s). (Nonassessable Reconstruction Paving Fund --$20,000). The total estimated cost of this project including the requested amount is $75,000. This project is anticipated to be completed during the 2027 construction season.
10th Aldermanic District

W. Michigan St. - N. 35th St. to N. 37th St. (ext’d) (Including N. 36th St. - W. Michigan St. to W. Wisconsin Ave. (ST211240153) File Number 251879: Asphalt pavement resurfacing, replace curb and gutter, sidewalk. and driveway approaches where necessary, sodding (6’ to 10’ width tree border area), green infrastructure bioswales and gr...