NUMB:
980795
VERS:
ORIGINAL
REF:
XXBY:
THE CHAIR
TITL:
Resolution authorizing the Commissioner of Public Works to issue a permit to C.G. Schmidt, general contractor, for the parking structure to be built at 215-225 East Chicago Street, for temporary occupancy of East Chicago Street and North Water Street adjacent to the new parking structure. (DPW)
ANLS:
- ANALYSIS - This resolution authorizes the Commissioner of Public Works to issue one or more permits to C.G. Schmidt, a general contractor, allowing use of East Chicago Street and North Water Street for construction related activities associated with a new parking structure to be located at 215-225 East Chicago Street. The entire width of the East Chicago Street roadway adjacent to the project site would be used for the duration of the project. However, the north sidewalk on Chicago would remain open. The Water Street sidewalk and parking lane adjacent to the site would also be closed. In addition, the easterly half of North Water Street to the centerline of the road would be used occasionally as conditions dictate. Construction is expected to begin in October and last about seven months.
BODY:
Whereas, Business Improvement District Number 2 (the Historic Third Ward) plans to construct a parking structure at the southeast corner of East Chicago and North Water Streets (215-225 East Chicago); and
Whereas, BID #2 has hired C.G. Schmidt to construct the new parking structure; and
Whereas, C.G. Schmidt has requested permission to use the segments of North Water Street and East Chicago Street which abut the project site for construction-related activities; and
Whereas, The East Chicago Street segment to be used for construction related activities would encompass the sidewalk adjacent to the site as well as the entire roadway and would be used for the duration of the project; and
Whereas, The North Water Street segment would include the sidewalk and the parking lane adjacent to...