Number
250146
Version
Original
Reference
241329
Sponsor
THE CHAIR
Title
Resolution authorizing area-wide and scattered sites sidewalk replacement at various areas and appropriating funds for these purposes with the city construction cost estimated to be $1,850,000 for a total estimated cost of these projects being $1,865,000.
Analysis
To provide the necessary authority for sidewalk repairs at various areas. The City cost of these projects approved by this resolution is estimated to be $1,850,000. The total estimated cost of these projects is $1,865,000.
Whereas, It is necessary and in the public interest to replace those sidewalk stones which are cracked, broken, out of grade or otherwise a hazard to pedestrians; and
Whereas, It is proposed that sidewalk replacement work be done in the following locations at the indicated cost:
4th and 8th Aldermanic Districts
Area bounded by N. 17th St., W. Wells St., N. 20th St., and W. State St.; and Area Bounded by S. 27th St., W. Kinnickinnic River Pkwy., S. 35th St., W. Forest Home Ave., and railroad right of way (ST230250101) File Number 241329: Laying concrete walk. Doing all necessary grading pertaining to said work. (Assessable Sidewalk Reconstruction Paving Fund -- $298,000; Nonassessable Sidewalk Reconstruction Paving Fund -- $642,000). The total estimated cost for this project including the requested amount is $940,000. This project is anticipated to be completed during the 2025 construction season.
ADA ramps for 2025 Area wide sidewalk repair areas (ST216250112) File Number 241716: Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund -- $160,000). The total estimated cost of this project including the requested amount is $175,000. This project is anticipated to be completed during the 2025 construction season.
City Wide
2025 Scattered Sites (ST230250102) File Number 241329: Laying concrete walk. Doing all necessary grading pertaining to said work. (Assess...