powered help
header-left header-center header-right
File #: 080239    Version:
Type: Resolution Status: Passed
File created: 6/10/2008 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 7/1/2008
Effective date:    
Title: Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,830,000 for a total estimated cost of these projects being $6,491,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS
Attachments: 1. Infrastructure Services Division Cover Letter, 2. Hearing notice list, 3. Comptroller Certification for Downtown Connector, 4. Comptroller certification for Kinnickinnic River Bicycle Trail, 5. Fiscal note, 6. Sub Fiscal Note
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
7/11/20082 MAYOR SIGNED   Action details Meeting details Not available
7/1/20082 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
6/18/20081 PUBLIC WORKS COMMITTEE AMENDED

Minutes note: Ald. Donovan moved to amend by deleting the following: Various Aldermanic Districts Downtown Connector Alternative Analysis study administered by the Wisconsin Center District and funded with an FTA grant that requires a local match shared by the City of Milwaukee and Milwaukee County. As the alternatives have increased in scope, the city’s total estimated portion of the local match is $580,000 of which $395,000 can be achieved using in-kind services with the remainder funded using Special number special number for this ST320080000 (City Share Non-Assessable Paving Fund - $185,000). Previously authorized for preliminary engineering: $0.00 Current capital estimated cost of the Alternative Analysis study including this resolution: $185,000.00 Current estimated City of Milwaukee in-kind cost of the Alternative Analysis study: $395,000.00
Pass4:0 Action details Meeting details Not available
6/18/20082 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTIONPass4:0 Action details Meeting details Not available
6/13/20081 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
6/13/20080 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
6/10/20080 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
080239
Version
SUBSTITUTE 2
Reference
070757
Sponsor
THE CHAIR
Title
Substitute resolution approving construction of nonassessable public improvements at various locations and appropriating funds for these purposes with the City construction cost estimated to be $3,830,000 for a total estimated cost of these projects being $6,491,000.
Analysis
This resolution directs the installation and construction of certain public improvements which have been determined to be nonassessable by the Commissioner of Public Works. The City cost of the projects approved by this resolution is estimated to be $3,830,000. The total estimated cost of these projects is $6,491,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions determining it necessary and in the public interest to construct nonassessable improvements; and

Whereas, Plans, specifications and cost estimates have been prepared for the following described improvements:

4th Aldermanic District

Intersection at E. Erie St., N. Milwaukee St. and E. Corcoran Ave. (TD05684003) File Number 070757: Intersection modifications. (TID Fund -- $100,000). The total estimated cost for this project including the requested amount is $100,000. This project is anticipated to be completed during the 2008 construction season.

Intersection at N. Milwaukee St., E. Menomonee St. and N. Young St. (TD05684003) File Number 070757: Intersection modifications. (TID Fund -- $300,000). The total estimated cost for this project including the requested amount is $300,000. This project is anticipated to be completed during the 2008 construction season.

N. 10th St. - W. State St. to 300 feet south of W. State St. (SM495060048) File Number 070488: Relay storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $10,000 Additional Fund). The total estimated cost for this project including the requested amount is $91,000. The project has been completed.

8th Aldermanic District

S. 38th S...