Number
110833
Version
Substitute 1
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $290,000 for a total estimated cost of these projects being $1,410,500.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $290,000 with the total cost estimated to be $1,410,500.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:
1st Aldermanic District
W. Custer Ave. at N. Hopkins St. (ST211120172): Laying concrete sidewalk. (Nonassessable Reconstruction Paving Fund -- $5,000). The total estimated cost for this project including the requested amount is $15,000. This project is anticipated to be completed during the 2012 construction season.
4th Aldermanic District
St. Paul Ave. Vertical Lift Bridge over the Milwaukee River (BR100100106): Consultant design services for structural, mechanical, hydraulic, and electrical engineering. (City Share Non-assessable Structure Fund -- $250,000, Additional Funds). The total estimated cost for this project including the requested amount is $1,250,000. This project is anticipated to be completed during the 2013-2014 construction season.
5th Aldermanic District
Alley between W. Capitol Dr., W. Melvina St., N. 80th St., and N. 81st St. (SM495110536): Sewer work prior to paving. (Nonassessable Sewer Maintenance Relay Fund -- $6,000, Additional Funds). The total estimated cost for this project including the requested amount is $9,000. This projec...