File #: 160106    Version:
Type: Resolution Status: Passed
File created: 5/24/2016 In control: COMMON COUNCIL
On agenda: Final action: 6/14/2016
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,098,500 for a total estimated cost of $1,167,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. Cover Letter, 2. Official Notice, 3. Notice Published on 6-30-16
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/22/20161 MAYOR SIGNED   Action details Meeting details Not available
6/14/20161 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
6/1/20161 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - Department of Public Works 7th Aldermanic District N. 54th Blvd. - W. Keefe Ave. to W. Melvina St. (ST211150114): Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (24-foot width of tree border area), and grading. Ald. Rainey stated he is in support of the project. Ald. Donovan moved approval. (Prevailed 5-0) 10th Aldermanic District Alley between W. Adler St., W. Main St., S. 72nd St., and S. 73rd St. (ST212160112): Concrete alley pavement reconstruction, and grading. Ald. Murphy did a postcard survey and only received 3 residents in opposition. Ald. Donovan moved approval. (Prevailed 5-0) 12th Aldermanic District W. Walker St. - S. 2nd St. to S. 3rd St. (ST211150184): Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (10 - 12-foot width of tree border area), and grading. Ald. Perez is in support of the project. Ald. Bohl moved approval. (Prevailed 5-0) Alley between W. Scott St., W. Washington St., S. 7th St., and S. 8th St. (ST212040117): Concrete alley pavement reconstruction, and grading. Ald. Perez is in support of the project. There was only 1 resident in objection. Ald. Bohl moved approval. (Prevailed 5-0) Ald. Bohl moved approval as amended. (Prevailed 5-0)
Pass5:0 Action details Meeting details Video Video
5/24/20160 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
160106
Version
SUBSTITUTE 1
Reference
131739
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,098,500 for a total estimated cost of $1,167,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,098,500. The total estimated cost of these projects is $1,167,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

7th Aldermanic District

N. 54th Blvd. - W. Keefe Ave. to W. Melvina St. (ST211150114) File Number 151739: Concrete pavement reconstruction, replace all curb and gutter, replace sidewalk and driveway approaches where necessary, sodding (24-foot width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $46,000; Nonassessable Reconstruction Paving Fund -- $700,000). The total estimated cost for this project including the requested amount is $775,000. This project is anticipated to be completed during the 2016 construction season.

10th Aldermanic District

Alley between W. Adler St., W. Main St., S. 72nd St., and S. 73rd St. (ST212160112) File Number 141725: Concrete alley pavement reconstruction, and grading. (Assessable Alley Paving Fund -- $26,500; Nonassessable Alley Paving Fund -- $100,000). The total estimated cost for this project including the requested amou...

Click here for full text