powered help
header-left header-center header-right
File #: 981186    Version: 0
Type: Ordinance Status: Passed
File created: 11/24/1998 In control: ZONING, NEIGHBORHOODS & DEVELOPMENT COMMITTEE
On agenda: Final action: 12/18/1998
Effective date: 1/1/1999    
Title: An ordinance relating to the fees for installation of heating, ventilating, air conditioning and refrigeration systems and equipment. (Building Inspection)
Sponsors: THE CHAIR
Indexes: BUILDING CODE, FEES
NUMB:
981186
VERS:
ORIGINAL
REF:

XXBY:
THE CHAIR
TITL:
An ordinance relating to the fees for installation of heating, ventilating, air conditioning and refrigeration systems and equipment. (Building Inspection)
SECS:
200-33-23-a rc
200-33-23-c rc
200-33-23-d rc
200-33-23-e rc
200-33-23-f rc
200-33-23-h-4 cr
200-33-47 rp
ANLS:
- Analysis -

This ordinance makes various clarification-type changes to the building code provisions relating to fees for installation of heating, ventilating, air conditioning and refrigeration systems and equipment. It also creates permit fees for heating and ventilation system repairs.
BODY:
The Mayor and Common Council of the City of Milwaukee do ordain as follows:

Part 1. Section 200-33-23-a of the code is repealed and recreated to read:

200-33. Fees.

23. HEATING AND VENTILATING SYSTEMS.

a. Heating and Ventilating. The permit fees for installation of heating and ventilating systems and equipment shall be as follows:

a-1. Heating, incinerator units and wood-burning appliances: $40 per unit not exceeding 150,000 BTUs of input. For each additional 50,000 BTUs or fraction thereof, an additional fee of $10 shall be charged.

a-2. Heating and air conditioning distribution systems: $1 per 100 square feet of conditioned area. The minimum fee shall be $40.

a-3. Air conditioning and refrigeration units: $40 per unit not exceeding 3 tons. For each additional ton or fraction thereof, an additional fee of $5 shall be charged.

a-4. Unit, room and radiant heaters: $15 per heater. The minimum fee shall be $35.

a-5. Spray booths: $5 for each 1,000 cubic-feet-per-minute capacity or part thereof of the spray booth fan or blower. The minimum fee for any installation in any one building shall be $40.

a-6. Commercial or industrial exhaust hoods: $50.

Part 2. Section 200-33-23-c to f of the code is repealed and recreated to read:

c. Boilers. The permit fee for the installation or replace...

Click here for full text