HISTORIC PRESERVATION COMMISSION
| ADOPTED
Minutes note: Mr. Jakubovich gave an overview of the staff report. The proposal is for a new accessible addition consisting of a new entrance, stairs, elevator, and corridor replacing the old gangway between the rectory and church buildings on the opposite side of Mitchell Street. This project replaces the one that was brought to the Commission about a year ago with the accessible entrance being proposed for the side on Mitchell Street. There will be a connector between the church and old rectory building. The addition would be built directly behind the connector and would not be visible from the street. The addition would essentially fill the gangway between the church and rectory building. It would not extend beyond the rectory building. The new entrance would consist of a wall with a door with a glazed entrance, be made of cream city brick, and have three skylights on top. Staff was concerned that the stained glass windows would be negatively impacted by water collected between the church and rectory building, but the architect addressed that concern with a gutter or trough that would take up the majority of the water runoff. Staff recommended approval.
Ms. Pieper Eisenbrown moved approval, seconded by Mr. Hoeschen, of a Certificate of Appropriateness for a new accessible addition on the south elevation of St. Anthony Church at 1711 S. 9th Street in the Mitchell Street Historic District for St. Anthony Congregation. There were no objections.
| Pass | 6:0 |
Action details
|
Meeting details
|
Video
|