powered help
header-left header-center header-right
File #: 090282    Version:
Type: Resolution Status: Placed On File
File created: 7/7/2009 In control: COMMON COUNCIL
On agenda: Final action: 2/27/2013
Effective date:    
Title: Substitute resolution relating to the design, configuration and elevation of a future replacement for the Hoan Bridge.
Sponsors: ALD. BAUMAN
Indexes: BRIDGES
Attachments: 1. Fiscal note, 2. Proposed Substitute B, 3. Hearing Notice List
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
2/27/20131 COMMON COUNCIL PLACED ON FILEPass13:0 Action details Meeting details Not available
2/13/20131 PUBLIC WORKS COMMITTEE RECOMMENDED FOR PLACING ON FILEPass3:0 Action details Meeting details Not available
2/11/20131 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
2/8/20131 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
12/7/20091 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
12/7/20091 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
7/15/20091 CITY CLERK DRAFT SUBMITTED   Action details Meeting details Not available
7/15/20091 PUBLIC WORKS COMMITTEE HELD TO CALL OF THE CHAIRPass5:0 Action details Meeting details Not available
7/15/20090 PUBLIC WORKS COMMITTEE SUBSTITUTED

Minutes note: Proposed Substitute A offered.
Pass5:0 Action details Meeting details Not available
7/10/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
7/10/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
7/10/20090 PUBLIC WORKS COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
7/7/20090 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
090282
Version
SUBSTITUTE 1
Reference

Sponsor
ALD. BAUMAN
Title
Substitute resolution relating to the design, configuration and elevation of a future replacement for the Hoan Bridge.
Analysis
This resolution expresses the City of Milwaukee’s opposition to any changes to the design, configuration or elevation of the Hoan Bridge and its approaches unless all of the following conditions are met:

1. The bridge and its approaches use the existing right-of-way and substantially the same footprint.
2. The bridge approaches remain elevated over all land uses that are currently beneath the approaches, including, but not limited to, Port of Milwaukee, MMSD and Henry W. Maier Festival Park facilities.
3. Moveable bridge spans have sufficient clearance over the mean water level to minimize bridge openings for non-commercial vessels.
4. Bridge openings are limited to non-peak traffic periods, except for emergencies.
5. The bridge and its approaches accommodate pedestrian and bicycle traffic.
6. The cross-sections of the bridge and its approaches are no wider than 2 travel lanes and one distress lane, bicycle lane and sidewalk in each direction.
7. The Lake Shore Interchange is eliminated and replaced by an at-grade intersection or roundabout in the approximate location of Clybourn Street and Lincoln Memorial Drive.
8. All new or reconstructed structures are designed with lighting and architectural elements developed in consultation with the City of Milwaukee.
Body
Whereas, The Hoan Bridge provides an invaluable transportation link, for both residents and businesses alike, between Downtown Milwaukee and Bay View and other South Side/South Shore communities; and

Whereas, The Hoan Bridge has contributed greatly to the economic development of these communities; and

Whereas, The current right-of-way footprint and elevation of the Hoan Bridge allow for smooth operation of Port of Milwaukee and Milwaukee Metropolitan Sewerage District (“MMSD”) facilities and th...

Click here for full text