Legislation Details

File #: 260069    Version:
Type: Resolution Status: Passed
File created: 5/12/2026 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 6/2/2026
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $873,880 for a total estimated cost of $1,196,800.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AD 12.pdf, 2. Letter Signed.pdf, 3. Ad signed (5).pdf, 4. AFR 12.pdf
Related files: 251286
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/3/20261 MAYOR SIGNED   Action details Meeting details Not available
6/2/20261 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
5/20/20261 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Appeared Holly Rutenbeck (DPW) 6th Aldermanic District N. Vel R Phillips Ave. -W. Vine St. To W. Reservoir Ave. (ST211260118). Install traffic calming speed humps(s). Appear Gerrett Kelly and Caitlin Forsythe they are in favor of placing a speed hump. Ald. Bauman moved approval. There were no objections. 7th Aldermanic District Alley between W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. (ST212240104). Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. No public testimony. Ald. Moore supports the project. Ald. Bauman moved approval. There were no objections. 10th AIdermanic District Alley between W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave. (ST212240102). Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading storm drainage facilities, and permeable pavement as necessary. Appeared Gloria Ellum, Oscar Ellum and Charles Ellum they are not in support. Appeared Robert Stetson he wants more information before he makes a decision. Appeared Teresa Brown she is in support. Appeared Terry Roby she is in support. Appeared Arthur Roby he is in support. Ald. Bauman moved approval. There were no objections. 11th AIdermanic District S. 53rd St. - W. Oklahoma Ave. to W. Montana St (ST211250131). Asphalt pavement resurfacing, replace sidewalk and driveway approaches where necessary sodding (6ft width tree border area), and grading. No public testimony. Ald. Burgelis supports the project. Ald. Taylor moved approval. There were no objections. 14th Aldermanic District S. 11th St. - W. Morgan Ave. to W Holt Ave (ST211260117). Install traffic calming speed humps (s). No public testimony. Ald. Dimitrijevic supports the project. Ald. Taylor moved approval. There were no objections.
Pass5:0 Action details Meeting details Video Video
5/12/20260 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
260069
Version
SUBSTITUTE 1
Reference
251286
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $873,880 for a total estimated cost of $1,196,800.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $873,880. The total estimated cost of these projects is $1,196,800.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

6th Aldermanic District

N. Vel R. Phillips Ave. - W. Vine St. to W. Reservoir Ave. (ST211260118). Install traffic calming speed hump(s). (Assessable Reconstruction Paving Fund -- $1,985; Nonassessable Reconstruction Paving Fund -- $6,415). The total estimated cost for this project including the requested amount is $8,400. This project is anticipated to be completed during the 2026 construction season.

7th Aldermanic District

Alley between W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. (ST212240104). File Number 251286: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities, and permeable pavement as necessary. (Assessable Alley Paving Fund - $35,400; Nonassessable Alley Paving Fund -- $145,000). The total estimated cost for this project including the requested amount is $400,000. This project is anticipated to be...

Click here for full text