NUMB:
991182
VERS:
SUBSTITUTE 1
REF:
980620
XXBY:
THE CHAIR
TITL:
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
ANLS:
-Analysis-
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.
BODY:
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:
1st Aldermanic District
W. Fairmount Ave. - N. 28th St. to N. Teutonia Ave. (ST21100133) File Number 980620: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund -- $24,800; Assessable Reconstruction Paving Fund -- $4,500)
3rd Aldermanic District
Alley between E. Belleview Pl., E. Park Pl., N. Prospect Ave. and N. Stowell Ave. (ST21200109) File Number 970181: Concrete alley pavement reconstruction, replace some abutting sidewalk and driveway approaches, and grading. (Nonassessable Alley Paving Fund -- $32,800; Assessable Alley Paving Fund -- $16,700)
5th Aldermanic District
N. 98th St. - W. Lisbon Ave. to W. Capitol Dr. (ST21100123) File Number 920110: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund -- $54,600; Assessable Reconstruction Paving Fund -- $6,200)
6th Aldermanic District
Alley between W. Keefe Ave., W. Vienna Ave., N. 4th St. and N. 5th St. (Northerly 500 ft. m/l) (ST21200135) File Number 980909: Concrete alley pavement reconstruction, replace ...
Click here for full text