File #: 230184    Version:
Type: Resolution Status: Passed
File created: 5/31/2023 In control: COMMON COUNCIL
On agenda: Final action: 6/20/2023
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $991,000 for a total estimated cost of $1,040,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AD Proof.pdf, 2. Signed LTR.pdf, 3. Signed AD.pdf, 4. Notice published 7/7/2023
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
7/7/20231 CITY CLERK PUBLISHED   Action details Meeting details Not available
6/28/20231 MAYOR SIGNED   Action details Meeting details Not available
6/20/20231 COMMON COUNCIL ADOPTEDPass14:0 Action details Meeting details Video Video
6/7/20231 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Holly Rutenbeck - DPW 15th Aldermanic District W. Wright St. – N. 35th St to N. Sherman Blvd. (Incl. traffic circle in the N. Grant Blvd. intersection) (ST211190198) File Number 221122: Asphalt pavement resurfacing, replace all curb and gutter, sidewalk (narrow from 6 feet to 5 feet) and driveway approaches where necessary, sodding (5.0’- 6.5’ width of tree border area), grading and tree removal where necessary. (Assessable Reconstruction Paving Fund – $41,000; Nonassessable Reconstruction Paving Fund -- $950,000). The total estimated cost for this project including the requested amount is $1,040,000. This project is anticipated to be completed during the 2023 construction season. Ald. Stamper moved approval of this item. There were no objections. Ald. Brostoff moved approval of the file as amended. There were no objections.
Pass5:0 Action details Meeting details Video Video
5/31/20230 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
230184
Version
SUBSTITUTE 1
Reference
221122
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $991,000 for a total estimated cost of $1,040,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $991,000. The total estimated cost of these projects is $1,040,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

15th Aldermanic District

W. Wright St. - N. 35th St to N. Sherman Blvd. (Incl. traffic circle in the N. Grant Blvd. intersection) (ST211190198) File Number 221122: Asphalt pavement resurfacing, replace all curb and gutter, sidewalk (narrow from 6 feet to 5 feet) and driveway approaches where necessary, sodding (5.0’- 6.5’ width of tree border area), grading and tree removal where necessary. (Assessable Reconstruction Paving Fund - $41,000; Nonassessable Reconstruction Paving Fund -- $950,000). The total estimated cost for this project including the requested amount is $1,040,000. This project is anticipated to be completed during the 2023 construction season.

; and

Whereas, The report of the Commissioner of Public Works has been filed with the City Clerk; and

Whereas, Notices have been sent to all interested persons and public hearings held; now, therefore, be it

Resolved, By the Common Counc...