Title: Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $240,000 for a total estimated cost of these projects being $3,500,000.
Sponsors: THE CHAIR
Number
260077
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various nonassessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $240,000 for a total estimated cost of these projects being $3,500,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $240,000 with the total cost estimated to be $3,500,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

6th Aldermanic District

W. Hampton Ave. - N. Port Washington Rd. to N. Santa Monica Blvd. (SM499260004) Installing bioswales. (Nonassessable Water Quality Fund -- $20,000). The total estimated cost of this project including the requested amount is $250,000. This project is anticipated to be completed during the 2026 construction season.

8th Aldermanic District

W. Canal St. - N. 27th St. Overpass to W. Potawatomi Cir. (SM499260003) Installing bioswales. (Nonassessable Water Quality Fund -- $20,000). The total estimated cost of this project including the requested amount is $250,000. This project is anticipated to be completed during the 2026 construction season.

City Wide

ADA ramps for 2027 High impact paving north-side projects: (ST216260106) Replace curb and gutter and sidewalk as necessary (Nonassessable High Impact Paving Fund - $100,000). The total estimated cost of this project including the requested amount is $1,500,000. This project is anticipated to be completed during the 2027 construction season.

ADA ramps for 2027 High impact paving south-side projects: (ST216260107...