powered help
header-left header-center header-right
File #: 971501    Version:
Type: Resolution Status: Passed
File created: 1/20/1998 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/10/1998
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS, TREES, WATER MAINS
NUMB:
971501
VERS:
SUBSTITUTE 1
REF:
970442
XXBY:
THE CHAIR
TITL:
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations.
ANLS:
-Analysis-

This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements.
BODY:
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

3rd Aldermanic District

E. Townsend St. - N. Booth St. to N. Holton St. (878-0764-1) File Number 970442: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $35,310; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $6,735)

E. Wyoming Pl. - N. Terrace Ave. to N. Summit Ave. (873-0745-1) File Number 911399: Asphalt pavement resurfacing, replace all curb and gutter, replace sidewalk and driveway approaches where needed, sodding, and grading. (Nonassessable Reconstruction Paving Fund 31-523---211-0001 -- $66,470; Assessable Reconstruction Paving Fund 71-523---211-0001 -- $8,915)

Alley between N. Fratney St., E. Keefe Ave., N. Pierce St. and E. Townsend St. (888-0684-3) File Number 960740: Concrete alley pavement reconstruction, replace some abutting sidewalk and driveway approaches, grading, and storm drainage facilities where needed. (Nonassessable Alley Paving Fund 31-523---212-0001 -- $77,250; Assessable Alley Paving Fund 71-523---212-0001 -- $34,250)

5th Aldermanic District

Alley between W. Burleigh St., W. Chambers St., N. 83rd St....

Click here for full text