powered help
header-left header-center header-right
File #: 240144    Version:
Type: Resolution Status: Passed
File created: 5/21/2024 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 6/11/2024
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $3,738,706.20 for a total estimated cost of $13,333,047.29.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AD 12.pdf, 2. Signed Letter.pdf, 3. Public Works - May 30, 2024, 4. Resolution Certification 2225-15-70.pdf, 5. Signed AD.pdf, 6. Objections to Lake Dr Reconstruction, 7. Support to Lake Dr. Reconstruction, 8. Objections 2nd Packet, 9. Support 2nd Packet
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
6/14/20241 MAYOR SIGNED   Action details Meeting details Not available
6/11/20241 COMMON COUNCIL ADOPTEDPass12:0 Action details Meeting details Not available
5/30/20241 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Holly Rutenbeck - DPW 1st Aldermanic District N. 23rd st. - W. Ruby Ave. to W. corneli st. (ST211230105) Concrete pavement reconstruction, replace all curb and gutter, and driveway approaches, replace sidewalk where necessary, sodding (7' width Of tree border area), tree removal as necessary, grading, storm drainage facilities, and permeable pavement as necessary. Motion to approve by Ald. Westmorland. 5-0 2nd Aldermanic District Alley betw. W. Congress St., W. Marion st., N. 62nd st., N. 63rd St. (ST212220120) Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches. grading, storm drainage facilities, and permeable pavement as necessary. REsident in opposition: James 4369 N 62nd Street Motion to approve by Ald. Taylor. 5-0 3rd Aldermanic District N. Lake Dr. (STH 32) - E. Newberry Blvd. to E. Edgewood Ave. (ST320180101) Concrete pavement reconstruction, replace all curb and gutter, and driveway approaches, replace sidewalk where necessary. storm sewer. traffic signals. street lighting, on-street protected bike lanes, sodding (varying width Of tree border area). and grading. Present: David Tapia - DPW Resident's testimony: Jennifer Abele - not in support Willam Lynch - 3410 N Lake Drive - in support, but concern with the Public Safety Cade Gerlach - 700 E Kilbourn Ave Sandra McSweeney - 3415 N Lake Drive Dina Goodie - 3465 N Lake Drive Laura Path - 2949 N Lake Drive Anne Baillie Novikova - 2728 N 90th St Motion to approve by Ald. Brostoff. 3-1 Ald. Coggs Ald. Taylor Abstained N. Water st. - E. Brady st. to N. Humboldt Ave. (ST211230140) Install traffic calming speed table(s). Resident testimony: Christine Capanero 18 N Water St - Support Ms. DiAngelo 1888 N Water - Support Matt 1785 N Water St - Support Motion by Ald. Brostoff 4-0 Ald. Taylor excused. 3rd and 4th Aldermanic Districts N. Prospect Ave. - E. Knapp St. to E. Ivanhoe Pl. (ST211230124) Install traffic calming speed table(s) and bump out(s). Residents testimony: June Kosac - 1610 N Prospect Ave - Support Laura Kahl - 1300 N Prospect Ave - Support Mike Soderling - 1300 N Prospect Ave #115 Carrie Hagman - 1660 N Prospect Ave - Support Andres De Leon - 1660 N Prospect Ave Rosemary Molard - 1707 N Prospect Ave - Support Susan Budkovich - 2009 N Prospect Ave Cade Garlach - 700 E Kilbourn Ave - Support John Doherty - seasonal Milwaukee resident Motion to approve by Ald. Westmorland. 5-0
Pass5:0 Action details Meeting details Video Video
5/21/20240 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
240144
Version
SUBSTITUTE 1
Reference
221683
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $3,738,706.20 for a total estimated cost of $13,333,047.29.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $3,738,706.20. The total estimated cost of these projects is $13,333,047.29.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

1st Aldermanic District

N. 23rd St. - W. Ruby Ave. to W. Cornell St. (ST211230105) File Number 221683: Concrete pavement reconstruction, replace all curb and gutter, and driveway approaches, replace sidewalk where necessary, sodding (7’ width of tree border area), tree removal as necessary, grading, storm drainage facilities, and permeable pavement as necessary. (Assessable Reconstruction Paving Fund -- $46,590; Nonassessable Reconstruction Paving Fund -- $410,000). The total estimated cost for this project including the requested amount is $470,000. This project is anticipated to be completed during the 2024 construction season.

2nd Aldermanic District

Alley betw. W. Congress St., W. Marion St., N. 62nd St., N. 63rd St. (ST212220120) File Number 220993: Concrete alley pavement reconstruction, replace some abutting walk or driveway approaches, grading, storm drainage facilities...

Click here for full text