powered help
header-left header-center header-right
File #: 120707    Version: 0
Type: Resolution Status: Passed
File created: 9/25/2012 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/16/2012
Effective date:    
Title: Resolution authorizing the Commissioner of Public Works to enter into a local Force Account contract with the Wisconsin Department of Transportation for the design of traffic signals, traffic signs and street lighting improvements in conjunction with the rehabilitation of the Hoan Bridge between 2013 and 2015; with the total cost being $49,180.41 of which 100% is grantor funded.
Sponsors: THE CHAIR
Indexes: CONTRACTS, STREET LIGHTING, TRAFFIC CONTROL SIGNALS
Attachments: 1. Work Order for Design Engineering, 2. Work Order Checklist, 3. Work Order Schedule.pdf, 4. Work Order Staff.pdf, 5. Work Order Staff Page 2, 6. Work Order Worksheet.pdf, 7. Comptroller's Certification, 8. Hearing Notice List
Number
120707
Version
ORIGINAL
Reference

Sponsor
THE CHAIR
Title
Resolution authorizing the Commissioner of Public Works to enter into a local Force Account contract with the Wisconsin Department of Transportation for the design of traffic signals, traffic signs and street lighting improvements in conjunction with the rehabilitation of the Hoan Bridge between 2013 and 2015; with the total cost being $49,180.41 of which 100% is grantor funded.
Analysis
This resolution authorizes the Commissioner of Public Works to enter into a local Force Account contract with the Wisconsin Department of Transportation for the design of traffic signals, traffic signs and street lighting improvements in conjunction with the rehabilitation of the Hoan Bridge between 2013 and 2015; with the total cost being $49,180.41 of which 100% is grantor funded.
Body
Whereas, The Wisconsin Department of Transportation will be rehabilitating the Hoan Bridge between 2013 and 2015; and

Whereas, Construction activity on the Hoan Bridge will create new temporary freeway on and off ramps, close existing on and off ramps, and change local intersection geometrics; and

Whereas, The City of Milwaukee has executed a Master Contract 0696-20-13 on March 15, 2011 with the Wisconsin Department of Transportation for engineering design services on Connecting Highway projects; and

Whereas, The Wisconsin Department of Transportation has authorized the City of Milwaukee to do preliminary design work needed to prepare a Local Force Account contract against the Connecting Highway Master Contract in advance of the execution of a Memorandum of Understanding and/or State Municipal Agreement for the rehabilitation of the Hoan Bridge to provide reimbursement of actual costs for necessary services and items provided by the City for local street traffic signal, traffic sign and street lighting improvements in conjunction with the Hoan Bridge rehabilitation; and

Whereas, The total estimated cost of engi...

Click here for full text