Substitute resolution directing the Commissioner of Public Works to execute project agreements titled State/Municipal Agreement for an Infrastructure Transportation Alternatives Program (TAP) Project with the Wisconsin Department of Transportation and to set up funds for design engineering at total estimated cost of $1,156,068 and an estimated City of Milwaukee share of $231,214 and a grantor share of $924,854.
Analysis
This resolution authorizes and directs the Commissioner of Public Works to execute project agreements with the Wisconsin Department of Transportation for the programming, study, design and construction of bicycle facilities with 80 percent Federal and State aid under the Transportation Alternatives Program (TAP). This resolution also directs the City of Milwaukee Comptroller to transfer funds and establish project grant chartfield values for the preliminary engineering for these projects. The estimated total cost of the projects is $4,930,338 of which the City’s share is $986,068 and the grantor share is $3,944,270. The estimated preliminary engineering cost for these projects is $1,156,068 and an estimated City of Milwaukee share of $231,214 and a grantor share of $924,854. Construction funds for these projects will be included in future resolutions.
Body
Whereas, The project agreements have been requested from the Wisconsin Department of Transportation to be executed by the City of Milwaukee for the programming, study, design and construction of the following paving projects with Federal and State aid under the Transportation Alternatives Program (TAP):
State I.D. 2984-30-01/71
Hopkins Protected Bike Lane
Along W. Hopkins, W. Capitol Dr. and W. Locust St. from N Teutonia Ave to 34th St.
State I.D. 2984-31-01/71
Walnut Protected Bike Lane
Along W. Walnut St. and W. Lisbon Ave. from N. 20th St. to N. 40th St.
State I.D. 2984-33-01/71
Oklahoma Protected Bike Lan...