File #: 220494    Version: 0
Type: Resolution Status: Passed
File created: 7/28/2022 In control: COMMON COUNCIL
On agenda: Final action: 9/20/2022
Effective date:    
Title: Resolution directing the Commissioner of Public Works to execute a document titled “State/Municipal Agreement for a State-Let Highway Project” with the Wisconsin Department of Transportation for the programming, design, and construction of West Fond du Lac Avenue (STH 145) from North 19th Street to North 12th Street, and to set up funds for design engineering at an estimated total cost of $555,900 with an estimated City share of $138,976 and a grantor share of $416,924.
Sponsors: THE CHAIR
Indexes: INTERGOVERNMENTAL AGREEMENTS, STREET IMPROVEMENTS, WISCONSIN DEPARTMENT OF TRANSPORTATION
Attachments: 1. 1360-14-00-70 STH 145 CMil 12th-19th.pdf, 2. Resolution Certification 1360-14-00.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
9/29/20220 MAYOR SIGNED   Action details Meeting details Not available
9/20/20220 COMMON COUNCIL ADOPTEDPass11:0 Action details Meeting details Video Video
9/8/20220 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: David Tapia - DPW Ald. Stamper said that this is request from residents and asked if the residents have a say on the design. Mr. Tapia said that this project will lead to the final scoop work and design. He added that the DOT will be the project leader in coordination with DPW and that it will be shared with Ald. Stamper and the public as well.
Pass4:0 Action details Meeting details Video Video
7/28/20220 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
220494
Version
ORIGINAL
Reference
Sponsor
THE CHAIR
Title
Resolution directing the Commissioner of Public Works to execute a document titled “State/Municipal Agreement for a State-Let Highway Project” with the Wisconsin Department of Transportation for the programming, design, and construction of West Fond du Lac Avenue (STH 145) from North 19th Street to North 12th Street, and to set up funds for design engineering at an estimated total cost of $555,900 with an estimated City share of $138,976 and a grantor share of $416,924.
Analysis
This resolution directs the Commissioner of Public Works to execute a State/Municipal Agreement with the Wisconsin Department of Transportation for the programming, design, and construction of West Fond du Lac Avenue (STH 145) from North 19th Street to North 12th Street. The State/Municipal Agreement provides for 75 percent Federal and State aid and 25 percent local cost sharing for preliminary engineering. The total estimated cost of this project is $7,992,250 with a grantor share of $7,600,524 and a City share of $391,726. This resolution also directs the City Comptroller to transfer funds for preliminary engineering at an estimated cost of $555,900 with an estimated City share of $138,976 and a grantor share of $416,924. Construction funds for this project will be included in future resolutions.
Body
Whereas, A project agreement has been requested and received from the Wisconsin Department of Transportation (WisDOT) to be executed by the City of Milwaukee for the programming, design, and construction of West Fond du Lac Avenue (STH 145) from North 19th Street to North 12th Street with Federal and State aid under the State Highway Rehabilitation Program; and

Whereas, The Department of Public Works shall notify the Common Council of the City of Milwaukee of project cost overruns and changes in scope approved by the Department of Public Works; and

Whereas, The Common Council of the City of Milwaukee recog...