Number
171534
Version
SUBSTITUTE 1
Reference
Sponsor
ALD. ZIELINSKI
Title
Substitute resolution directing the Commissioner of Public Works to identify the of costs associated with the replacement of lead laterals, lead pipes and the provision of water filters.
Analysis
This resolution directs the Commissioner of Public Works to estimate the costs of:
1. Replacing drinking water lead service lines connecting all properties in Milwaukee to water utility mains.
2. Replacing lead-pipe plumbing in all properties in Milwaukee.
3. Providing water filters capable of eliminating lead in drinking water, and replacement filters when needed, to all residential properties in Milwaukee connected to the water utility main by lead drinking water service lines.
4. Providing water filters capable of eliminating lead in drinking water, and replacement filters when needed, to all residential properties in Milwaukee occupied by households with household incomes below the Federal Poverty Level which are connected to the water utility main by lead drinking water service lines.
This resolution further requires the Commissioner of Public Works to report these cost estimates to the Common Council by February 28, 2018.
Body
Whereas, Lead drinking water service lines connecting properties to water utility mains and lead-pipe plumbing inside properties in the City of Milwaukee represent significant risks of lead poisoning for property occupants, especially pregnant women, formula-fed infants, nursing mothers and children under the age of 6; and
Whereas, The only way to completely eliminate these lead-poisoning risks is to the replace the lead drinking water service lines and the lead-pipe plumbing; and
Whereas, Installing water filters capable of eliminating lead in drinking water, and replacing filters when needed, is an effective interim method to mitigate the risk of lead poisoning until lead drinking water service lines and the lead-pipe plumbing can be replaced; ...
Click here for full text