powered help
header-left header-center header-right
File #: 991843    Version: 0
Type: Resolution Status: Passed
File created: 3/21/2000 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 4/11/2000
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Division)
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SIDEWALKS, SPECIAL ASSESSMENTS, STREET IMPROVEMENTS, TREES
NUMB:
991843
VERS:
ORIGINAL
XXBY:
THE CHAIR
TITL:
Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Division)
ANLS:
-Analysis-

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.
BODY:
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

1st Aldermanic District

W. Congress St. - N. Green Bay Ave. to N. 19th Pl. (ST211010148): Paving the roadway with asphalt. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work. (Nonassessable Reconstruction Paving Fund -- $2,000)

6th Aldermanic District

N. Booth St. - The Milwaukee River to N. Commerce St. (TD02284001): Concrete pavement construction, place curb and gutter, sidewalk and driveway approaches, sodding, grading, and tree removal where necessary.

N. Commerce St. - N. Holton St. to N. Humboldt Ave. (TD02284001): Concrete pavement construction, place curb and gutter, sidewalk and driveway approaches, sodding, grading, and tree removal where necessary.

N. Fratney St. - The Milwaukee River to N. Commerce St. (TD02284001): Concrete pavement construction, place curb and gutter, sidewalk and driveway approaches, sodding, grading, and tree removal where necessary....

Click here for full text