Number
140877
Version
SUBSTITUTE 1
Reference
Sponsor
THE CHAIR
Title
A substitute ordinance increasing various fees and forfeitures.
Sections
81-45-1 am
81-45-2 am
81-50-1 am
81-50-2 am
81-50-3 am
81-50-4 am
81-50-5 am
81-86-1 am
81-86-2 rp
81-102-3-a-1 am
81-102-3-a-2 am
81-102-3-a-3 am
81-102-3-b-1 am
81-102-3-b-2 am
81-102-3-b-3 am
81-102-4-a am
81-102-4-b am
81-102-4-c am
81-102-5-a am
81-102-5-b am
81-102-5-c am
81-102-6-a am
81-102-6-b am
81-102-6-c am
81-102.1-1 am
81-102.1-2 am
81-102.1-3 am
81-102.1-4 am
81-102.1-5 am
81-102.1-6 am
81-102.1-7 am
81-102.1-8-a am
101-34-7-b am
101-34-7-m cr
200-33-11-b am
200-33-11-e am
200-33-11-f am
200-33-11-i am
200-33-11-q am
200-33-11-u am
200-33-11-ya am
200-33-11-yf am
200-33-35-a-1 am
200-33-43-a am
200-33-43-b am
200-33-43-c am
200-33-43-d am
200-33-43-i am
200-33-43-j am
200-33-48-a am
Analysis
This ordinance increases various fees and forfeitures, effective January 1, 2015.
Body
The Mayor and Common Council of the City of Milwaukee do ordain as follows:
Part 1. Section 81-45 1 and 2 of the code is amended to read:
81-45. Driveway Permit.
1. The application fee for a permit to install a driveway shall be [[$150]] >>$155<<.
2. An additional fee shall be charged for each driveway permit processed to cover the costs of plan review and inspection in the amount of [[$70]] >>$72<<.
Part 2. Section 81-50-1 to 5 of the code is amended to read:
81-50. Excavation Permit and Inspection Fees for Work in the Public Right of Way.
1. GENERAL. For the excavation required for the construction or repair of an individual storm building sewer, sanitary building sewer, combined building sewer, water service, or any combination thereof laid simultaneously in a single excavation or in more than one excavation connected by tunneling or boring, the fee shall be [[$109]] >>$112<<.
2. MAIN OR CONDUIT. For the excavation required for the laying or repair of a main or conduit in each block the fee shall be [[$84] ...
Click here for full text