File #: 980909    Version:
Type: Resolution Status: Passed
File created: 10/9/1998 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 10/30/1998
Effective date:    
Title: Substitute resolution determining it necessary to make various assessable public improvements at various locations.
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, STREET IMPROVEMENTS
NUMB:
980909
VERS:
SUBSTITUTE 1
XXBY:
THE CHAIR
TITL:
Substitute resolution determining it necessary to make various assessable public improvements at various locations.
ANLS:
-Analysis-

This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.
BODY:
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

1st Aldermanic District

Alley between W. Colfax Pl., W. Eggert Pl., N. 21st St. and N. 22nd St. (880-0838-1): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

3rd Aldermanic District

Alley between E. Auer Ave., N. Booth St., E. Concordia Ave., N. Pierce St. and CMC Real Estate Right-of-Way (880-0819-8): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

6th Aldermanic District

Alley between N. Buffum St., E. Center St., E. Clarke St., and N. Holton St. (880-0833-4): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

Alley between N. Buffum St., E. Clarke St., N. Holton St. and E. Wright St. (880-0834-X): Paving the alley with concrete. Doing all the necessary grading pertaining to said work. (2000 Paving Program)

Alley between E. Clarke St., N. Fratney St., N. Pier...