powered help
header-left header-center header-right
File #: 221811    Version:
Type: Resolution Status: Passed
File created: 3/21/2023 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 4/18/2023
Effective date:    
Title: Substitute resolution determining it necessary to make various non assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $65,000 for a total estimated cost of these projects being $727,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS

Number
221811
Version
Substitute 1
Reference
220193
Sponsor
THE CHAIR
Title
Substitute resolution determining it necessary to make various non assessable public improvements at various locations and appropriating funds for these purposes with the City engineering cost estimated to be $65,000 for a total estimated cost of these projects being $727,000.
Analysis
This resolution authorizes engineering studies on projects which by City Charter are nonassessable. After design plans and estimates of costs have been prepared, a resolution authorizing construction will be submitted to the Common Council. The City cost for engineering these projects is estimated to be $65,000 with the total cost estimated to be $727,000.
Body
Resolved, By the Common Council of the City of Milwaukee, that it is necessary and in the public interest to do the following described improvements according to City specifications:

5th Aldermanic District

W. Good Hope Rd. - N. 107th St. to N. 124th St. (SM499200015) File Number 220193: Installing Bioswales. (Nonassessable Water Quality Fund -- $45,000 additional funding). The total estimated cost of this project including the requested amount is $380,000. This project is anticipated to be completed during the 2023 construction season.

9th Aldermanic District

N. 60th St. - 800’ North of W. Hemlock St. to 1000’ North of W. Hemlock St. (SM495230011) Relaying storm sewer. (Nonassessable Sewer Maintenance Relay Fund -- $20,000). The total estimated cost of this project including the requested amount is $347,000. This project is anticipated to be completed during the 2023 construction season.

;and, be it

Further Resolved, That all City Departments are authorized to perform engineering, surveys, plan preparation, and determine an estimated cost thereof; and, be it

Further Resolved, That the Department of Public Works is authorized to use the funding as specified in the above description of work; and, be it

Further Resolved, That th...

Click here for full text