powered help
header-left header-center header-right
File #: 081414    Version: 0
Type: Ordinance Status: Passed
File created: 2/10/2009 In control: ZONING, NEIGHBORHOODS & DEVELOPMENT COMMITTEE
On agenda: Final action: 4/14/2009
Effective date: 5/1/2009    
Title: An ordinance relating to certificates of occupancy and zoning.
Sponsors: THE CHAIR
Indexes: PERMITS, ZONING
Attachments: 1. Fiscal Note, 2. City Plan Commission Letter.pdf, 3. Zoning Code Technical Committee Letter, 4. Zoning Code Technical Committee Minutes, 5. Recording from the Zoning Code Technical Committee Meeting, 6. Hearing Notice List, 7. Notice Published on 4-30-09
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/30/20090 CITY CLERK PUBLISHED   Action details Meeting details Not available
4/23/20090 MAYOR SIGNED   Action details Meeting details Not available
4/14/20090 COMMON COUNCIL PASSEDPass14:0 Action details Meeting details Not available
4/8/20090 ZONING, NEIGHBORHOODS & DEVELOPMENT COMMITTEE RECOMMENDED FOR PASSAGE

Minutes note: Individuals present: Tom Mishefske and Art Dahlberg - Dept. of Neighborhood Services Chris Rute - Dept. of City Development
Pass5:0 Action details Meeting details Not available
2/12/20090 ZONING CODE TECHNICAL COMMITTEE HEARING NOTICES SENT   Action details Meeting details Not available
2/12/20090 CITY CLERK REFERRED TO   Action details Meeting details Not available
2/12/20090 CITY CLERK REFERRED TO   Action details Meeting details Not available
2/10/20090 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
081414
Version
ORIGINAL
Reference

Sponsor
THE CHAIR
Title
An ordinance relating to certificates of occupancy and zoning.
Sections
200-33-8.5 rc
200-33-32 rp
200-33-46-b am
200-42-2 am
200-42-3-a-0 am
200-42-3-b-0 am
295-301-0 am
295-303-0 am
Analysis
This ordinance deletes the term zoning certificate from the building code since they are no longer issued and are now called certificates of occupancy. It also includes the following:
1) Increases the fee for a duplicate certificate of occupancy and a business name change from $25 to $50.
2) Clarifies that a fee for a temporary certificate of occupancy is either $100 or $150 based on whether the square footage of the building is less than or greater than 10,000 square feet.
3) Clarifies that a conditional certificate of occupancy is obtained from the department of city development.
4) Clarifies that the fee for a demolition permit is calculated at 1% of the cost of the demolition.
5) In the case of a rooming house or daycare, adds the requirement to conduct inspections when an application for a certificate of occupancy is taken out even when the prior use of the building or space was the same.
Body
The Mayor and Common Council of the City of Milwaukee do ordain as follows:

Part 1. Section 200-33-8.5 of the code is repealed and recreated to read:

200-33. Fees.
8.5. CERTIFICATES OF OCCUPANCY. a. Certificates of Occupancy. a-1. The required fee for certificates of occupancy in existing buildings or parts thereof with gross areas of less than 10,000 square feet, open lots, outdoor storage and outdoor circuses shall be $200.
a-2. The required fee for certificates of occupancy in existing buildings or parts thereof with gross areas of 10,000 square feet or more shall be $400.
a-3. The required fee for certificates of occupancy in sites with multiple existing buildings shall be $350 per 10,000 square feet, with a minimum of $350.
a-4. The required fee for certificates of occupancy in new...

Click here for full text