powered help
header-left header-center header-right
File #: 001347    Version: 0
Type: Resolution Status: Passed
File created: 1/16/2001 In control: PUBLIC WORKS COMMITTEE
On agenda: Final action: 2/6/2001
Effective date:    
Title: Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Division)
Sponsors: THE CHAIR
Indexes: ALLEY IMPROVEMENTS, PUBLIC IMPROVEMENTS, SIDEWALKS, STREET IMPROVEMENTS
Attachments: 1. Fiscal Note.pdf
Number
001347
Version
ORIGINAL
Sponsor
THE CHAIR
Title
Resolution determining it necessary to make various assessable public improvements at various locations. (Infrastructure Services Division)
Analysis
This resolution authorizes engineering studies and directs the Commissioner of Public Works to determine any benefits or damages which would result if the projects were to be constructed. After the Commissioner files his report, a Public Hearing will be held on those projects determined assessable. A resolution will be submitted after the Public Hearing authorizing construction.
Body
Resolved, By the Common Council of the City of Milwaukee that it is necessary and in the public interest to do the following described work according to City specifications, and that such public improvements and resulting special assessments be made pursuant to Section 66.60 and any other pertinent sections of the Wisconsin Statutes and in the manner directed by Section 115-42 of the Milwaukee Code of Ordinances:

6th Aldermanic District

N. Cape St. – E. Vine St. to E. Ship St. (TD02284019) (TID-22): Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work.

E. Dock St. – The Milwaukee River to N. Commerce St. (TD02284019) (TID-22) : Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work.

E. Ship St. – The Milwaukee River to N. Commerce St. (TD02284019) (TID-22): Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work.

E. Vine St. – The Milwaukee River to N. Commerce St. (TD02284019) (TID-22): Paving the roadway with concrete. Laying a concrete curb and gutter. Laying concrete sidewalk. Doing all the necessary grading pertaining to said work.

Alley...

Click here for full text