Title: Substitute resolution authorizing city-wide sidewalk replacement at Scattered Sites and appropriating funds for these purposes with the city construction cost estimated to be $640,000 for a total estimated cost of these projects being $690,000.
Sponsors: THE CHAIR
Indexes: SIDEWALK IMPROVEMENTS, SIDEWALKS
Attachments: 1. Hearing Notice List
Number
111476
Version
SUBSTITUTE 1

Reference

Sponsor
Ald. Bauman
Title
Substitute resolution authorizing city-wide sidewalk replacement at Scattered Sites and appropriating funds for these purposes with the city construction cost estimated to be $640,000 for a total estimated cost of these projects being $690,000.
Analysis
To provide the necessary authority for sidewalk repairs at Scattered Sites. The City cost of these projects approved by this resolution is estimated to be $640,000. The total estimated cost of these projects is $690,000.
Body
Whereas, It is necessary and in the public interest to replace those sidewalk stones which are cracked, broken, out of grade or otherwise a hazard to pedestrians; and

Whereas, It is proposed that sidewalk replacement work be done in the following locations at the indicated cost:

City Wide

Scattered Site Area #1 North (ST230120141) File Number 111022: Laying concrete walk. Doing all necessary grading pertaining to said work. ($25,000 to the Assessable Sidewalk Fund ST230120141; and $200,000 to the Nonassessable Sidewalk Fund ST230120141). The total estimated cost for this project including the requested amount is $275,000. This project is anticipated to be completed during the 2012 construction season.

Scattered Site Area #2 South-West (ST230120142): Laying concrete walk. Doing all necessary grading pertaining to said work. ($25,000 to the Assessable Sidewalk Fund ST230120142; and $200,000 to the Nonassessable Sidewalk Fund ST230120142). The total estimated cost for this project including the requested amount is $225,000. This project is anticipated to be completed during the 2012 construction season.

Scattered Site Area #3 Central and South-East (ST230120143): Laying concrete walk. Doing all necessary grading pertaining to said work. ($15,000 to the Assessable Sidewalk Fund ST230120143; and $175,000 to the Nonassessable Sidewalk Fund ST230120143). The total estimated cost for this project...