File #: 231825    Version:
Type: Resolution Status: Passed
File created: 3/19/2024 In control: COMMON COUNCIL
On agenda: Final action: 4/9/2024
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,242,385 for a total estimated cost of $1,410,000.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. AD 10.pdf, 2. Signed LTR.pdf, 3. Signed AD.pdf, 4. AFR 10.pdf, 5. Notice published 4/26/2024
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/26/20241 CITY CLERK PUBLISHED   Action details Meeting details Not available
4/15/20241 MAYOR SIGNED   Action details Meeting details Not available
4/9/20241 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Video Video
3/27/20241 PUBLIC WORKS COMMITTEE  

Minutes note: Holly Rutenbeck - DPW Ms. Rutenberg said that all the projects are supported by the survey results and the local alderperson. 2nd Aldermanic District N. 86th St. - W. Silver Spring Dr. to W. Fond Du Lac Ave. (ST211220177) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8' width of tree border area), and grading. Ald. Perez moved approval. There were no objections. (Prevailed 5-0) W. Medford Ave. - N. 86th St. to N. 87th St. (ST211230133) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8' width of tree border area) , and grading. Ald. Brostoff moved approval. There were no objections. (Prevailed 5-0) 5th Aldermanic District N. Colonial Dr. - W. Auer Ave. to W. Concordia Ave. (Sponsored by the City of Wauwatosa) (ST211230147) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (7.5' width of tree border area), and grading. Ald. Westmoreland moved approval. There were no objections. (Prevailed 5-0) W. Sarasota Pl. - N. 95th St. to N. 1OOth St. (Sponsored by the City of Wauwatosa) (ST211070143) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8' width of tree border area), and grading. Ald. Westmoreland moved approval. There were no objections. (Prevailed 5-0) 8th Aldermanic District W. Pierce St. - At S. 22nd St. and S. 24th St. (ST211230123) Install concrete traffic calming raised crosswalks. Neighbors in support: Mr. and Mrs. Alamo - 716 S 26th St - they own three properties on the street. Ald. Zamarripa moved approval. There were no objections. (Prevailed 5-0)
   Not available Meeting details Video Video
3/19/20240 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available
Number
231825
Version
SUBSTITUTE 1
Reference
211860
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $1,242,385 for a total estimated cost of $1,410,000.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $1,242,385. The total estimated cost of these projects is $1,410,000.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

2nd Aldermanic District

N. 86th St. - W. Silver Spring Dr. to W. Fond Du Lac Ave. (ST211220177) File Number 211860: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund - $40,590; Nonassessable Reconstruction Paving Fund -- $265,000). The total estimated cost for this project including the requested amount is $330,000. This project is anticipated to be completed during the 2024 construction season.

W. Medford Ave. - N. 86th St. to N. 87th St. (ST211230133) File Number 230040: Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (8’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund - $30,340; Nonassessable Reconstruction Paving Fund -- $210,000). The total estima...

Click here for full text