powered help
header-left header-center header-right
File #: 191885    Version:
Type: Resolution Status: Passed
File created: 3/24/2020 In control: COMMON COUNCIL
On agenda: Final action: 4/14/2020
Effective date:    
Title: Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $444,100 for a total estimated cost of $463.500.
Sponsors: THE CHAIR
Indexes: PUBLIC IMPROVEMENTS, SPECIAL ASSESSMENTS
Attachments: 1. signed letter 10.pdf, 2. signed ad 10.pdf
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
4/23/20201 MAYOR SIGNED   Action details Meeting details Not available
4/14/20201 COMMON COUNCIL ADOPTEDPass15:0 Action details Meeting details Not available
4/1/20201 PUBLIC WORKS COMMITTEE RECOMMENDED FOR ADOPTION

Minutes note: Mary Dziewiontkoski - DPW 5th Aldermanic District N. 78th St. – W. Vienna Ave. to W. Capitol Dr. (ST211150141) Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9’ width of tree border area), and grading. Ald. Borkowski moved approval. (Prevailed 4-0) 6th Aldermanic District N. 6th St. – W. Burleigh St. to W. Ring St. (ST211190174) Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 4-0) 7th Aldermanic District W. Nash St. – N. 56th St. to N. 57th St. (ST211190152) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0) N. 21st St. – W. Locust St. to W. Chambers St. (ST211190176) Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 4-0) N. 39th St. – W. Courtland Ave. to W. Hampton Ave. (ST211190205) Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 4-0) N. 44th St. – W. Fiebrantz Ave. to W. Hope Ave. (ST211190179) Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 4-0) N. 45th St. – W. Fiebrantz Ave. to W. Hope Ave. (ST211190195) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0) N. 55th St. – W. Nash St. to W. Vienna Ave. (ST211190181) Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 4-0) 14th Aldermanic District W. Harrison Ave. – S. 9th St. to S. 10th St. (ST211190184) Install traffic calming speed hump(s). Ald. Kovac moved approval. (Prevailed 4-0) 15th Aldermanic District W. Cherry St. – N. 23rd St. to N. 24th St. (ST211190183) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0) W. Vine St. – N. 26th St. to N. 27th St. (ST211190189) Install traffic calming speed hump(s). Ald. Johnson moved approval. (Prevailed 4-0) N. 9th St. – W. Clarke St. to W. Center St. (ST211190201) Install traffic calming speed hump(s). Ald. Borkowski moved approval. (Prevailed 4-0)
Pass4:0 Action details Meeting details Video Video
3/24/20200 COMMON COUNCIL ASSIGNED TO   Action details Meeting details Not available

Number
191885
Version
SUBSTITUTE 1
Reference
140037
Sponsor
THE CHAIR
Title
Substitute resolution approving levying of assessments and construction of assessable public improvement projects at various locations and appropriating funds for these purposes with the City cost of these projects approved by this resolution is estimated to be $444,100 for a total estimated cost of $463.500.
Analysis
This resolution confirms the report of the Commissioner of Public Works, as modified by the Common Council Committee, on projects for which Public Hearings have been held. The resolution authorizes the levying of special assessments and directs the installation and construction of said public improvements. The City cost of these projects approved by this resolution is estimated to be $444,100. The total estimated cost of these projects is $463,500.
Body
Whereas, The Common Council of the City of Milwaukee adopted preliminary resolutions, determining it necessary and in the public interest to construct and levy special assessments for the following improvements:

5th Aldermanic District

N. 78th St. - W. Vienna Ave. to W. Capitol Dr. (ST211150141) File Number 140037:
Asphalt pavement resurfacing, replace curb and gutter, sidewalk and driveway approaches where necessary, sodding (9’ width of tree border area), and grading. (Assessable Reconstruction Paving Fund -- $25,600; Nonassessable Reconstruction Paving Fund -- $310,000). The total estimated cost of this project including the requested amount is $355,000. This project is anticipated to be completed during the 2020 construction season.

6th Aldermanic District

N. 6th St. - W. Burleigh St. to W. Ring St. (ST211190174) Install traffic calming speed hump(s).(Assessable Reconstruction Paving Fund -- $11,000; Nonassessable Reconstruction Paving Fund -- $5,000). The total estimated cost of this project including the requested amount is $16,000. This project is anticipated to be completed during the 2020 c...

Click here for full text